TopWinder
®
34
Belanger, Inc. ®* 1001 Doheny Ct. * Northville, MI 48167 * Ph (248) 349-7010 * Fax (248) 380-9681
1MANUL755
Installation
Loading the
ShineMitt™ onto the Hub Assembly
9) Apply dielectric grease to the receptor on the LED. Align the indicators on the LED Receptor and
the Wire Harness Plug and press them together gently so the pins do not get bent.
10) Carefully feed the wire connections through the End Plate Holes and into the Hub Assembly.
11) Apply Red Loctite 271 to the End Plate Fasteners and reassemble the End Plate back onto the
Hub Assembly.
12) Secure the LED Wires to the End Plate with the plastic Clamps, refer to image above on right.
13) Apply Anti-Seize
™ to the Hub Cap Fasteners and reassemble the Hub Cap back onto the Hub
Assembly.
Align tabs on
connectors and
press together
gently. Wrap
connection with
electrical tape.
Step 9:
Apply Red Loctite 271 to
the End Plate Fasteners.
Step 11:
Carefully feed the
Wires thru the
End Plate Holes
into the Hub.
Step 10:
Fully Loaded Top Wheel
with Shine
Mitt™
Apply Anti-
Seize™ to the
fasteners and reattach the Hub
Cap to the Hub Assembly.
Step 14:
Secure the LED
Wires to the
End Plate with
the Clamps.
Step 12: