7.2.2 Connecting multiple Modbus devices (series connection)
Connection work - series connection
Illustration
Description / explanation
2
1
1. Loosen the 4 screws
[1]
.
2. Lift the top cover
[2]
.
5
2
47 C 3
B 4 6
7
3. Raise the top cover
[2]
slightly and pull the terminal
clamp
[47]
off.
4. Remove the plugs
[7]
and screw the
cable gland components
[4, 5, 6]
off the
right cable gland
[B]
and left cable gland
[C]
.
5. Remove the dust protection pane
[3]
.
6 mm
50 mm
(1.97 in)
(0.23 in)
6. Prepare connection cable
[X7]
and connection
cable
[X8]
.
Original installation and operation manual
BEKOMAT
®
14i / 14i CO / 14i CO PN25
43 | 76
Содержание BEKOMAT 14i
Страница 73: ...Original installation and operation manual BEKOMAT 14i 14i CO 14i CO PN25 73 76 ...
Страница 74: ...16 2 Declaration of Conformity BEKOMAT 14i 14i CO 14i CO PN25 Original installation and operation manual 74 76 ...
Страница 75: ...Original installation and operation manual BEKOMAT 14i 14i CO 14i CO PN25 75 76 ...