Connection work - single device
Illustration
Description / explanation
Connection cable
[X7]
8. Connect the connection cable
[X7]
according to the
terminal diagram “4.9 Terminal diagram power control
board” on Page 32.
B
4
X7
5
6
47
9. Screw the cable gland components
[4, 5, 6]
onto the
right cable gland
[B]
.
10. Fit the screw terminal
[47]
.
2
1
11. Set the top cover
[2]
in place and insert the screws
[1]
.
12. Tighten the screws
[1]
with a torque of
0.5 Nm +0.5 Nm (0.37 ft-lb +0.37 ft-lb).
BEKOMAT
®
14i / 14i CO / 14i CO PN25
Original installation and operation manual
42 | 76
Содержание BEKOMAT 14i
Страница 73: ...Original installation and operation manual BEKOMAT 14i 14i CO 14i CO PN25 73 76 ...
Страница 74: ...16 2 Declaration of Conformity BEKOMAT 14i 14i CO 14i CO PN25 Original installation and operation manual 74 76 ...
Страница 75: ...Original installation and operation manual BEKOMAT 14i 14i CO 14i CO PN25 75 76 ...