Start-up
20
BEKOBLIZZ® LC 12-355
9 Start-up
9.1 Preliminary
stages
Note!
Exceeding of the operating parameters!
Ensure that the operating parameters comply with the nominal values indicated on the name plate of the
chiller (voltage, frequency, air pressure, air temperature, ambient temperature etc.).
Prior to delivery, this chiller was thoroughly tested, packed and checked. Please verify the soundness of the chiller
during the initial start-up and check the perfect functioning during the first operating hours.
The initial start-up must be carried out by qualified personnel.
During the installation and operation of this device, all national regulations regarding electronics and
any other federal and state ordinances, as well as local provisions, need to be adhered to.
The operator and the user must ensure that the chiller is not operated without panels.
9.2 Initial
start-up
Note!
The chiller
must not be started up more than six times an hour
. Wait at least five minutes prior to
every restart.
The user is responsible for the compliance with these provisions. Irreparable damage can be caused by
starting up the device too often.
The method below should be applied during the first start-up, after longer downtimes or subsequent to
maintenance works.
The start-up must be carried out by certified skilled personnel.
Processing sequence (see Section 11.1 "Control panel")
Ensure that all steps of the "Installation" chapter have been carried out.
Ensure that the connection to the compressed-air system is in accordance with the provisions and that the lines are
fixed and supported properly.
Ensure that the condensate drain pipe is fixed in accordance with the provisions and that it is connected with a
collection system or a container.
Ensure that the bypass system (if installed) is open and that the chiller is disconnected from the compressed-air
system.
Ensure that the manual valve of the condensate drainage cycle is open.
Ensure that the cooling-water flow and the cooling-water temperature are in accordance with the provisions (water-
cooled).
Remove any packaging material and other items which may block the space around the chiller.
Establish the mains connection (plug into socket).
• Start the chiller by switching on the main switch on the control panel (pos. 1).
• Make sure that the electronic control unit is switched on.
• Ensure that the power consumption complies with the values on the name plate.
•
Ensure that the fan runs properly – wait for the first interventions (air-cooled).
• Wait until the dew point remains stable.
• Slowly open the air inlet valve.
• Slowly open the air outlet valve.
• Slowly close the central bypass valve of the system (if installed).
• Check the pipes for air leakage.
• Ensure the proper functioning of the condensate drain cycle (wait for the first condensate discharges).
Содержание Bekoblizz LC 12-355
Страница 22: ...Technical data 22 BEKOBLIZZ LC 12 355 10 Technical data 10 1 Technical data BEKOBLIZZ LC 12 35 1 230 50 60 ...
Страница 23: ...Technical data BEKOBLIZZ LC 12 355 23 10 2 Technical data BEKOBLIZZ LC 55 355 1 230 50 ...
Страница 24: ...Technical data 24 BEKOBLIZZ LC 12 355 10 3 Technical data BEKOBLIZZ LC 12 150 1 115 60 ...
Страница 25: ...Technical data BEKOBLIZZ LC 12 355 25 10 4 Technical data BEKOBLIZZ LC 55 355 1 230 60 ...
Страница 40: ...Maintenance troubleshooting spare parts and dismantling 40 BEKOBLIZZ LC 12 355 ...
Страница 41: ...Maintenance troubleshooting spare parts and dismantling BEKOBLIZZ LC 12 355 41 ...
Страница 44: ...Appendices 44 BEKOBLIZZ LC 12 355 13 1 2 Chiller dimensions BEKOBLIZZ LC 55 ...
Страница 45: ...Appendices BEKOBLIZZ LC 12 355 45 13 1 3 Chiller dimensions BEKOBLIZZ LC 90 115 ...
Страница 46: ...Appendices 46 BEKOBLIZZ LC 12 355 13 1 4 Chiller dimensions BEKOBLIZZ LC 150 240 ...
Страница 47: ...Appendices BEKOBLIZZ LC 12 355 47 13 1 5 Chiller dimensions BEKOBLIZZ LC 355 ...
Страница 49: ...Appendices BEKOBLIZZ LC 12 355 49 13 2 2 Exploded diagram BEKOBLIZZ LC 12 35 ...
Страница 50: ...Appendices 50 BEKOBLIZZ LC 12 355 13 2 3 Exploded diagram BEKOBLIZZ LC 55 ...
Страница 51: ...Appendices BEKOBLIZZ LC 12 355 51 13 2 4 Exploded diagram BEKOBLIZZ LC 90 115 ...
Страница 52: ...Appendices 52 BEKOBLIZZ LC 12 355 13 2 5 Exploded diagram BEKOBLIZZ LC 150 240 ...
Страница 53: ...Appendices BEKOBLIZZ LC 12 355 53 13 2 6 Exploded diagram BEKOBLIZZ LC 355 ...
Страница 60: ...Appendices 60 BEKOBLIZZ LC 12 355 ...
Страница 61: ...EC Declaration of Conformity BEKOBLIZZ LC 12 355 61 14 EC Declaration of Conformity ...
Страница 62: ...EC Declaration of Conformity 62 BEKOBLIZZ LC 12 355 ...