PD-TaD 80
Connecting the system
822-188-3
43 / 74
No.
Cable
Step
13
Protective ring
(conductive hook and
loop fastener tape)
Attach a protective ring to the cable termination of the phase to be tested
–
directly over the screen.
Important:
Ensure that the protective ring does not come into contact with
the screen.
14
VSE cables with 2
connection clips
(yellow)
Use the VSE cable to short-circuit the protective ring to a de-energised
phase on which no measurement is to be taken.
The de-energised phase is used as a return circuit for leakage currents from
the far end.
At the near end of the test object:
15
–
Clean the cable termination of the phase to be tested carefully.
16
–
Attach the anti-corona hoods of the anti-corona protection device to the
cable termination of the phase to be tested.
17
Protective ring
(conductive hook and
loop fastener tape)
Attach a protective ring to the cable termination of the phase to be tested
–
directly over the screen.
Important:
Ensure that the protective ring does not come into contact with
the screen.
18
VSE cables with Ø 4
mm connector and a
connection clip
(yellow, 2x)
Connect a VSE cable to each of the
VSE
ports on the PD-TaD 80.
From the
VSE
ports connect a VSE cable to:
the protective ring of the phase to be tested.
the de-energised phase that is used as a return circuit for leakage
currents from the far end.
19
HV connection cable of
PD-TaD 80
Connect the PD-TaD 80 (
HV OUT
port) to the phase to be tested.
To do this, select the shorter of the two supplied HV connection cables.
Place the HV connection cable as far away as possible from the adjacent
live and earthed parts.