Ready to switch on
Prerequisites: All accesses to the test area are closed. The safety measures of the
Out of
operation
operating state that are necessary before stepping into the danger area are lifted.
The test voltage supply is switched off.
The red indicator light comes on.
In operation
Prerequisites: All accesses to the test area are closed.
One or more test voltage supplies are switched on.
The red indicator light comes on.
5.2
Switching off the system following faults or in emergencies
In the event of a fault or an emergency, immediately press the emergency off button.
Pressing the emergency off button puts the system in the safe
Ready for operation
operating state.
Follow the user manual for the cable test van or the VLF HV
generator.
5.3
Managing measurements
Depending on the system configuration, measurements performed using the PD-TaD 80 are
configured and managed via the BAUR system software or directly on the viola / viola TD
VLF HV generator (standalone).
Follow the user manuals for the BAUR system software and the
VLF HV generator.