Baumer Hübner
Electrical installation
|
6
V1, T1 | HMG10 & HMG10P SSI
Operating Manual
31
Tool
n
20 mm
n
22 mm
Instruction:
a) Loosen the screws at the terminal box.
b) Lift the terminal box off the encoder.
c) Loosen the cable gland at the terminal box.
d) Insert the supply cables into the cable gland, let stick out approx. 50 mm of cable.
e) Connect cable shield to cable gland and make sure it covers a large area.
f) Assign the supply cables to the terminals.
g) Attach the cable gland to the terminal box.
h) Mount the terminal box at the encoder. To do this, tighten the screws with a torque of 2-3
Nm.
6.8.2
Pin assignment first terminal box
NOTICE
Operating voltage present at the outputs results in encoder damage.
The encoder might be damaged by any operating voltage being present at the outputs.
a) Make sure that no operating voltage is present at the outputs.
SSI
Programming interface (programmable product variant only)
Additional output incremental 1 (optional)
4
12
3
2
1
6
7
8
11
10
9
14
15
16
5
13
Ill. 6:
Pin assignment
1
dnu / SA
I
2
dnu / SB
I
3
dnu / A+
II
4
dnu / A−
II
5
dnu / B+
II
6
dnu / B−
II
7
Ub
8
0V
9
nE+
10
nE−
11
PRE
12
DIR
13
D+
14
D−
15
C+
16
C−