25.

 

 CLEANING OF BOILER PROBE 

 

To clean the probe of the boiler, do as follows:  

1.

 

open the rear panel of the machine; 

2.

 

find the boiler and the probe; 

3.

 

unscrew the probe by using a wrench and take it out; 

4.

 

clean  the  probe  with  fine  grain  scrubbing  paper  in  order  to 

eliminate all encrustation; 

5.

 

re-assemble  the  probe  and  check  that  there  are  no  leakages 
when the boiler is under pressure  

 

 

 

 
 

 
 

 

 

 
26.

 

 MOTOR OVERHEATING 

 

 
The  lightening  up  of  the  respective  icon  signals  that  the  motor  is 

overheated  and  has  been  under  stress.    In  this  case  clean  the 
motor  and  remove  any  dust  which  has  gathered  on  it.  The  icon 

may also lighten up in the event of lack of one of the three phases 

on  the  motor.  In  this  case  check  the  power  current  fuses  (see 
SUBSTITUTION OF POWER CURRENT FUSES). 

To restart the machine do as follows: 

-

 

set the main switch on position 

“0”;

 

-

 

unscrew the 4 screws of the panel; 

-

 

find the motor protector and reset it by pressing the 
key (

see fig. 8

).  

-

 

screw the screws back on and start the machine. 

 

 

27.

 

 SUBSTITUTION OF FUSES ON THE ELECTRONIC CARD 

 

Substitution of fuses is required when a short circuit or an overload occurs.   

WARNING!: before replacing the fuse it is important to eliminate the cause which determined 

its breakage. 
To gain access to the fuses the main switch must be on pos. 

0

 and the four screws 

are to be unscrewed from the panel. The positioning of the fuses is indicated in 

Fig. 9

In  order  to  replace  a  fuse,  unscrew  it  by  using  a  screwdriver  and  turning  it 

anticlockwise, being careful to exert only a slight pressure.  To re-assemble it, do the 

opposite.    
N.B.:  SUBSTITUTE  FUSES  WITH  INTERCHANGEABLE  ONES  AND  WITH  THE  SAME 

PERFORMANCE. 
 

 

 

 

 

Fig. 8 

 

PROBE

Содержание PNEUMATIC ZEUS/A

Страница 1: ...ATIC ZEUS A mod 2009 POWER SUPPLY V 400 NEUTRAL TOTAL INSTALLED POWER W 11850 BOILER POWER W 9000 VACUUM BLOWING MOTOR POWER HP 1 75 HZ 50 PUMP POWER HP 0 8 HZ 50 BOILER CAPACITY L 10 IRONING ENDURANC...

Страница 2: ...s in stand by mode red led on This mode allows access to the SET menu in order to set functions such as language periodical maintenance warnings etc see point 6 Electronic card in stand by mode If mai...

Страница 3: ...m phase timing increase decrease keys Timing may be set from 0 to 99 seconds Air steam phase timing increase decrease keys Timing may be set from 0 to 99 seconds RESET Air phase timing increase decrea...

Страница 4: ...time Check that water comes out of the pipe connected to the water supply Turn off the main switch wait for 5 seconds and turn the machine on again If the problem reoccurs contact Authorized Service...

Страница 5: ...supply cable to a grounded outlet with observance of the law in force and a voltage suitable to ZEUS 4 Connect the compressed air tube to the pressure adapter and adjust it to a maximum pressure of 6...

Страница 6: ...ed Manufacturer authorized access only WARNING AFTER 10 ATTEMPTS TO ACCESS THE MAINTENANCE OR MANUFACTURER MENU WITHOUT TYPING IN THE PASSWORD AND OR BY TYPING THE WRONG PASSWORD THE SET MENU WILL BE...

Страница 7: ...by grasping the handle and pulling the racket with one s thumb fig 3 In addition by turning the handle clockwise or anticlockwise you can adjust the pressure exerted by the paddle on the garment prev...

Страница 8: ...ps too much a high pressure might cause hand injuries if accidentally pressed by the clamps Should it occur push immediately on the opening button fig 2 15 ADJUSTMENT OF OPENING AND CLOSING SPEED OF A...

Страница 9: ...he values stored by the manufacturer will be set According to the ironing program chosen the suggested air adjustment will be displayed Fig 1 Example KINTTED LADIES DRESS air adj 1 N B the setting of...

Страница 10: ...of arms and clamps Note 1 it is possible to interrupt the working cycle anytime by pressing the pedal 2 each time you change the type of fabric to iron and especially when changing from heavy fabrics...

Страница 11: ...or the operator 1 damaging of electrical cables of the iron 2 the earth protector switch is activated when switching on the main switch 3 using ZEUS during thunderstorms 4 using ZEUS without proper pr...

Страница 12: ...3 For six monthly cleaning of ZEUS follow these instructions open the side and back panels clean the inner part with compressed air with special care to the ventilator fan of the blowing motor 4 Chec...

Страница 13: ...he power current fuses see SUBSTITUTION OF POWER CURRENT FUSES To restart the machine do as follows set the main switch on position 0 unscrew the 4 screws of the panel find the motor protector and res...

Страница 14: ...uses the main switch must be on pos 0 and the four screws are to be unscrewed from the panel N B SUBSTITUTE FUSES WITH INTERCHANGEABLE ONES AND WITH THE SAME PERFORMANCE 29 COMPULSORY AND PERIODICAL M...

Страница 15: ...disposal and recycling of the machine s components assures protection of the natural environment Every product manufactured by BATTISTELLA B G S r l is subject to following limitations Battistella B...

Отзывы: