background image

10 

 

11

 

12

 

13 

 

14

 

15

 16 cm

 

21-1680-7D0001/A-05/11-BEH-D278564

EN 8/12

PSB 

Installation instructions

1

Connection

The dimensions specified in the installation instructions must be 
strictly observed!
Cut the heating tape with a straight cut.
Push on the cap for screw connection

 a

 and sealing 

b

.

Remove 145 mm of the protective outer sheath from the heating 
tape.

Push the protective braid back (1). Use the screwdriver to form an 
eyelet (2). Be careful not to damage the internal insulation.

Pull the heating tape out of the protective braid (3).

2

145

Installation kit  05-0091-0129/05-0091-0135

a

b

c

d

e

f

g

h

Self-limiting parallel heating cable

2 3

4

5

wire 

2   heating element 
3   insulating jacket 

metal braid covering 

5   protective outer sheath

1

1

2

2

3

3

Содержание PSB 27-1680

Страница 1: ...PSB Aufkleber EN 1 12 Installation and Operation Connection and Remote End Termination for PSB Type 27 1680 10 heating system...

Страница 2: ...21 1680 7D0001 A 05 11 BEH D278564 EN 2 12...

Страница 3: ...must be observed also Do not connect the heating tape s two supply wires short circuit 2 Technical data Rated voltage 110 to 120 V or 208 to 254 V Rated current max 32 A Referenced rated capacity max...

Страница 4: ...missioning The equipment may only be operated if it is clean and free of any damage Electrical systems must be examined by an electrician before commissioning and afterwards at certain intervals of ti...

Страница 5: ...the basis of the table and points 1 6 The blanks in the heating system s type number must be filled on the basis of the components used A water proof and lightfast marker must be used e g Staedtler Lu...

Страница 6: ...compliance with EN 60079 7 must be presented for all components Requirements set for connecting terminals Rated cross section 6 mm Working temperature 55 C up to 80 C Minimum distance between conduct...

Страница 7: ...EN 7 12 Declaration of Conformity Reservation Technical data subject to change without notice Changes errors and misprints may not be used as a basis for any claim for damages...

Страница 8: ...onnection a and sealing b Remove 145 mm of the protective outer sheath from the heating tape Push the protective braid back 1 Use the screwdriver to form an eyelet 2 Be careful not to damage the inter...

Страница 9: ...he strands out and twist them Remove the remaining heating element Fig 7 and 8 7 Reservation Technical data subject to change without notice Changes errors and misprints may not be used as a basis for...

Страница 10: ...ating tape Take the metal braid covering off the end of the heating cable Make sure that the internal insulation is not damaged Cut out a triangle 5 mm between the strands Screw the screw connection b...

Страница 11: ...EN 11 12...

Страница 12: ...EN 4 12 Max Eyth Stra e 16 97980 Bad Mergentheim Phone 49 7931 597 0 Fax 49 7931 597 494 info bartec de www bartec group com BARTEC GmbH Germany 21 1680 7D0001 10 09 BEH D278564...

Отзывы: