0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16 cm
21-1680-7D0001/A-05/11-BEH-D278564
EN 10/12
PSB
Installation instructions
10
12
Remote end termination
13
Put silicone adhesive
h
into the end cap
g
and onto the exposed
insulating jacket. Push the end cap over the end of the heating tape
until some of the adhesive oozes out.
Cut off the heating tape with a straight cut. Remove 7 mm from the
protective outer sheath on the heating tape.
Take the metal braid covering off the end of the heating cable.
Make sure that the internal insulation is not damaged. Cut out a
triangle (5 mm) between the strands.
Screw the screw connection body
a
in the enclosure.
Push the grounding strap
c
over the thread and secure it with a nut
b
. Connect the green/yellow core wire of the grounding strap to the
PE. Connect the heating tape in the junction box to L, N and PE,
insert the heating tape with the pushed-on sealing into the screw
connection body and tighten the screw cap. The grounding strap c
is not needed for stainless steel or aluminium enclosures.
11
140
7
5
Содержание PSB 27-1680
Страница 2: ...21 1680 7D0001 A 05 11 BEH D278564 EN 2 12...
Страница 11: ...EN 11 12...