Installation
APEX / SILAS
Pressurized Cabinet
Page 24 of 40
01-3704_7D0001_Manual_APC-SPC_20200617_jrs_en.docx
Rev.-
Mobile erection
If the APEX (SILAS) pressurized cabinet is to be mobile, please erect as follows:
Procedure
-
Erect the APEX (SILAS) pressurized cabinet at the intended site and
actuate the fixing elements to secure against rolling away.
-
Make the connection to the local potential equalisation.
-
During the installation, comply with the diagrams and technical documents
and the respective operating instructions for the fitted components and all
associated operating equipment.
-
Make sure that the APEX (SILAS) pressurized cabinet is installed in
compliance with the details in the technical documentation and the
specifications on the type plate.
Make sure that the following requirements are satisfied when installing:
Effective ventilation and exhaust and also adequate air circulation must be
ensured in front of the purging outlet.
Connection to the local potential equalisation
To prevent the accumulation of stale air, suitable spacing must be ensured
in front of the purging gas outlets and openings.
In particular, in front of the outlets, care must be taken to keep the ambient
air free of any dirt which might enter the outlets.
It is not permissible to allow any moisture near the external outlet openings
as it is important not to let moisture enter the openings (protection from
the weather).
Содержание APEX (APC) 07-3704 Series
Страница 1: ...Manual Pressurized Cabinet APEX APC SILAS SPC...
Страница 3: ......