Installation
Barco - OV-708/OV-713/OV-715– R59770137 – installation manual – revision 01– September 2007 ________________________________
________________________________
________________________________
_______________________________________________
_______________
_______________
_______________ 43
Step 51
Fix the cabling interface.
Seen from front, the cabling interface is mounted to
the right sidewall of a projection module located in
the mid of a column!
This position ensures that every projection unit can
be connected via 5m LAN cables!
The sheet metal is fixed to the sidewall via 4 screws.
Содержание OV-708
Страница 1: ...Installation manual OV 708 OV 713 OV 715 R59770137...
Страница 15: ......