C
Caution:
• Make sure that brickwork is build with a clearing of at least 3 mm between
the sides and top of the appliance and the brickwork. The appliance can
expand during operation due to heating.
Note:
• Make sure the thickness of any plastering is taken into account when the
brickwork is being build.
• Do not use masking tape on the appliance. Masking tape damages the
paint on the appliance.
• If you use other material than bricks, install the material in accordance with
the instructions of the supplier of the material
• If you use other material than bricks, refer to the instructions of the supplier
of the used material for information on the need to use a mantle iron.
1. Identify the positions where the fitting boxes of the ventilation air inlet and the
ventilation air outlet must be put. Refer to
5.1.2
for requirements on the size of the
ventilation air openings.
Important: Only for the optional Barbas Opti-Air system.
• Make sure to put the end of the NTC temperature measurement cable near the intended
location of the ventilation air inlet grate.
• Make sure to put the battery holder near the intended location of the ventilation air inlet
grate.
2. If applicable, identify the positions where the fitting boxes of the convection air inlets
and convection air outlets must be put. Refer to
5.1.2
for requirements on minimum
distances from ceiling and neighboring wall.
3. Identify the position where the dimmer for the convection ventilator must be put.
4. Build the brickwork around the appliance up to the upper frame around the glass.
a) Install the fitting boxes of the ventilation air inlets.
b) Put the end of the NTC temperature measurement cable in the fitting box of one
of the ventilation air inlets. Make sure the ventilation air flows around the end of
the NTC temperature cable.
c) If applicable, install the fitting boxes of the convection air inlets.
d) If applicable, install the dimmer of the convection ventilator.
5. If applicable, install a mantle iron to support the brickwork above the appliance. Put
the mantle iron on both sides of the brickwork. Maintain a space of at least 3 mm
between the appliance and the mantle iron.
6. If applicable, install the flexible aluminum pipes of the convection set. Refer to
5.3.5
.
7. Build the fireplace around the appliance.
a) Install the fitting boxes of the ventilation air outlets.
b) If applicable, install the fitting boxes of the convection air outlets
8. Install the frame around the appliance.
Installation
Evolux 100-45
25
Содержание Evolux 100-45
Страница 1: ...I Installation and maintenance manual Evolux 100 45 Serial number Production date...
Страница 35: ...8 8 Dimensions 8 1 Evolux 100 45 with 3 sided frame Dimensions Evolux 100 45 35...
Страница 36: ...8 8 2 Evolux 100 45 with 3 sided frame and convection casing Dimensions 36 Evolux 100 45...
Страница 39: ...8 8 5 Evolux 100 45 with 3 sided frame and fire screen Dimensions Evolux 100 45 39...
Страница 40: ...8 8 6 Evolux 100 45 with 4 sided frame Dimensions 40 Evolux 100 45...
Страница 42: ...8 8 8 Evolux 100 45 with 4 sided frame and convection casing Dimensions 42 Evolux 100 45...
Страница 44: ...8 8 10 Evolux 100 45 with 4 sided frame and fire screen Dimensions 44 Evolux 100 45...
Страница 48: ...Y Your Barbas dealer 002 07 10 2020...