
Preparing setup 10
Installation and connection
A rack-mount installation is preferred if possible. In this case mount the two angle brackets as shown. Alternatively ML Gateway can be placed on
its feet on a stable surface.
- Connect the Master Link cable from the installation to the ML socket on ML Gateway.
- Connect either the RS232 cable or the ethernet cable (depending on the communication type).
- Mount mains cable and the wire holder with screw to fasten the mains cable as illustrated below.
- Mount ML Gateway in the rack system or place it on a stable surface.
Now ML Gateway is ready for further setup. Press the mains switch on the front to switch on the product.
Rack-mount warnings
! When installing ML Gateway in a rack installation, the following precautions must be considered:
Operating temperatures
The operating ambient temperature of the rack installation may be higher than room ambient temperature.
Therefore, consideration should be given to installing the equipment in an environment compatible with the maximum ambient temperature
specified for the product (see
link
).
Reduced air flow
Installation of the equipment in a rack should be such that the amount of airflow required for safe operation of the equipment is not
compromised.
ML
RS232
Max. 10mm
Max. 10mm
ML
RS232