ENGLISH
31 / 60
0006160032_201711
NATURAL GAS IGNITION AND REGULATION
•
Bleed out the air contained in the gas piping, with due precautions
and with doors and windows open.
•
Open the union on the pipe near the burner and then open the
shut-off valves a little.
Wait until you smell gas, and then close the valve.
•
Wait the time necessary for the gas in the room to disperse outside.
Re-connect the burner to the gas pipeline.
•
Check that there is water in the boiler and that the gate valves of
the system are open.
•
Check that the discharge of combustion products through the boiler
gate and flue gate take places freely.
•
Check that thee voltage on the mains meets the manufacturer
requirements and that all electrical connections made at the
installation site are performed properly as illustrated in our wiring
diagram.
•
Make sure that the combustion head is long enough to enter the
furnace following the measure specified by the boiler manufacturer.
•
Check that the air regulation device on the combustion head is in
the correct position to deliver the required fuel.
•
The air passage between disk and combustion head must be
considerably reduced with minimum fuel delivery.
•
Increase combustion air flow when fuel delivery increases.
•
Refer to chapter "Air adjustment on the combustion head".
•
Fit a pressure gauge of appropriate scale to the pressure intake
on the gas pressure switch (if the amount of pressure to be used
allows it, we recommend to use a water column instrument; do not
use instruments with indicator pointers for low pressures).
1
2
10
3
4
9
11
5
display_TBML_ME
1 ON / OFF main switch.
2 Thermostatic line switch
3 Display
4 Unlock or RESET button
5 Fuse.
9 Fuel fill button
10 Fuel selector switch
11 Programming keypad
Содержание TBML 120 ME
Страница 2: ......
Страница 4: ...ITALIANO 2 60 0006160032_201711 ITALIANO Schemi elettrici 48 ...
Страница 50: ...ITALIANO 48 60 0006160032_201711 SCHEMI ELETTRICI ...
Страница 51: ...ITALIANO 49 60 0006160032_201711 ...
Страница 52: ...ITALIANO 50 60 0006160032_201711 ...
Страница 53: ...ITALIANO 51 60 0006160032_201711 ...
Страница 54: ...ITALIANO 52 60 0006160032_201711 BT1 BA BP I1 I2 I3 I4 ...
Страница 56: ...ITALIANO 54 60 0006160032_201711 ...
Страница 57: ...ITALIANO 55 60 0006160032_201711 ...
Страница 58: ...ITALIANO 56 60 0006160032_201711 ...
Страница 59: ...ITALIANO 57 60 0006160032_201711 ...
Страница 60: ...ITALIANO 58 60 0006160032_201711 BT1 BA BP I1 I2 I3 I4 ...
Страница 62: ......
Страница 64: ...ENGLISH 2 60 0006160032_201711 ENGLISH Wiring diagrams 48 ...
Страница 110: ...ENGLISH 48 60 0006160032_201711 WIRING DIAGRAMS ...
Страница 111: ...ENGLISH 49 60 0006160032_201711 ...
Страница 112: ...ENGLISH 50 60 0006160032_201711 ...
Страница 113: ...ENGLISH 51 60 0006160032_201711 ...
Страница 114: ...ENGLISH 52 60 0006160032_201711 BT1 BA BP I1 I2 I3 I4 ...
Страница 116: ...ENGLISH 54 60 0006160032_201711 ...
Страница 117: ...ENGLISH 55 60 0006160032_201711 ...
Страница 118: ...ENGLISH 56 60 0006160032_201711 ...
Страница 119: ...ENGLISH 57 60 0006160032_201711 ...
Страница 120: ...ENGLISH 58 60 0006160032_201711 BT1 BA BP I1 I2 I3 I4 ...
Страница 122: ......
Страница 123: ......