![Baldan MOVERE Скачать руководство пользователя страница 62](http://html1.mh-extra.com/html/baldan/movere/movere_instruction-manual_3587499062.webp)
A = L x V x F
X
A = 8,31 x 7.000 x 0,90 = 5,23 Ha/h
10.000
Calculations
• Approximate hourly output
To calculate the approximate hourly output of
MOVERE
, use the following formula:
Example:
A
MOVERE with 88 DISCS
, how many Ha will be produced in one hour of work at
an average speed of 7 km/h.
The hourly production of MOVERE can vary by factors that alter the work
rhythm as (soil moisture and hardness, terrain slope, inadequate
adjustments and speed of work).
WARNING
FORMULA DATA:
A = Area to be worked
L = Grid working width (in meters)
V = Average tractor speed (in meters / hour)
F = Production factor: 0,90
X = Value of the hectare: 10,000 m² (the amount varies by region).
A = ?
L = 8,31m
V = 7.000 m/h
F = 0,90
X = 10,000 m² (Calculated in hectares)
Model
Number
of Discs
Working
width
[mm]
Average
Speed
(m/h)
Production
Factor
Approximate
Production in
Hectares Hour
MOVERE
88
8315
7.000
0,90
5,23
108
10253
7.000
0,90
6,45
124
11815
7.000
0,90
7,44
The formula for calculating the approximate production refers to the calculation of
areas to be worked or worked by
MOVERE
. If you want to know the time that will be
spent to work an area of a known value, just divide the value of this area by the daily
output of
MOVERE.
Example
: What "X" time will be spent for a
MOVERE
disc harrows grid with 88 discs to
produce 35 hectares at an average speed of 7km/h?
X = 35 Ha = 6,69 hours approximately to work 35 hectares.
5,23 Ha/h
Instruction Manual
MOVERE
62
Содержание MOVERE
Страница 1: ...Super Tandem Articulated Disk Harrows MOVERE...
Страница 2: ......
Страница 76: ...Notes InstructionManual MOVERE 76...
Страница 77: ...Notes InstructionManual MOVERE 77...
Страница 80: ......
Страница 82: ......
Страница 85: ......
Страница 86: ......