36
Channel Stand Installation or Removal Procedure
Tools required:
7
/
16
” deep socket,
9
/
16
” wrench or socket
Parts List:
Item Number
Description
Qty
1
Channel stand, back
1
2
Channel stand, side
2
3
Bolt, carriage,¼” x 1-1/4” long
4
4
Bolt, hex head,
3
/
8
” x 1” long
8
5
Flat washer, ¼”
4
6
Lock washer, ¼”
4
7
Flat washer,
3
/
8
”
8
8
Lock washer,
3
/
8
”
8
9
Hex nut, ¼”
4
10
Adjustable leg leveler (or optional castor)
4
Note: to install a stand please follow Steps 1-7. To remove a stand, please reverse Steps 1-7.
Step 1:
Gather all stand components, hardware, and tools.
Step 2:
Place stand sides on a flat
floor so that the stainless steel legs
are setting on the floor. Next place
the stand back between the sides so
that the open part of the channel is
facing towards the floor.
Step 3:
Using the
3
/
8
”x 1” hex
head bolt with lock and flat
washers [Items 4, 7 & 8], attach
the sides and back by inserting the
bolts through the (4) holes located
in the channel stand back into the
already installed rivnuts in the two
sides. (2) bolts per side. Do not
tighten any of these bolts until you
have all (4) threaded in slightly.
Tighten bolts after this is done.
Channel
stand, back
Channel
stand, side
Channel
stand, back
3
/
8
” Hardware
Flip the stand
90º to access
lower hole
Содержание SterilGARD SG303
Страница 34: ...APPENDIX...
Страница 36: ...34 SG303 Ladder Schematic...