4 | PV 212 Instruction Manual-English
© 2005 Baker Hughes, a GE company – All rights reserved.
2.3 Fine Adjust Vernier (Figure #1)
To make accurate adjustments to the pressure, turn the fine adjust vernier (2) clockwise to
increase the pressure or counterclockwise to decrease the pressure.
3. Operation
1.
Remove the reservoir fill plug (7), fill the reservoir (5) to the indicated level (11), and
replace the fill plug.
2.
Connect a reference instrument to connection (8).
Note:
Use PTFE tape or appropriate sealant to seal all NPT connections. Do not
use PTFE tape on parallel threads. If PTFE tape is used to seal NPT threads, ensure
that only a sufficient amount is used to achieve pressure seal. If excess tape is
used, particles can become loose during the connector mating process and enter
the pump, potentially leading to loss of pump performance or pressure leaks.
3.
Connect the instrument under test to connection (9). Use pressure-rated flexible
hose or use the optional accessories to direct mount it.
4.
Set the fine adjust vernier (2) to the midpoint of its travel. Turn it fully clockwise, then
four to six turns counterclockwise.
5.
Open the pressure release valve (1). Turn it fully clockwise and then one turn
counterclockwise.
6.
Squeeze the scissor handles (4) fully together and turn the selector (3) to the “Prime”
position.
7.
Remove trapped air from the pump by squeezing the scissor handles (4) several
times. Make sure that the fluid inlet tube (6) remains immersed in fluid at all times.
8.
Close the pressure release valve (1) by turning it fully clockwise, and tighten to seal.
9.
To prime the system, squeeze the scissor handles (4) together and then release them
to get the fluid into the pump cylinder. Repeat this operation until the system is fully
INFORMATION
To prevent damage, DO NOT use force to turn the fine
adjust vernier (2).
WARNING
Uncontrolled release of high pressure is dangerous and may
cause damage to equipment. Because the internal pressure can get very
high during operation, make sure that all the connections are made
correctly.
DO NOT ignore the maximum operating pressure specified on the pump
label.
Before you connect a pressure component to the PV 212, make sure that it
is isolated from the pressure supply and release the internal pressure
slowly. DO NOT connect the pump to an external pressure source.
Содержание Druck PV 212
Страница 2: ......
Страница 4: ...ii PV 212 Instruction Manual English 2005 Baker Hughes a GE company All rights reserved...
Страница 12: ...8 PV 212 Instruction Manual English 2005 Baker Hughes a GE company All rights reserved...
Страница 20: ...16 PV212 Bedienungsanleitung Deutsch 2005 Baker Hughes a GE Company Alle Rechte vorbehalten...
Страница 28: ...24 Manual de instrucciones PV 212 Espa ol 2005 Baker Hughes a GE Company Reservados todos los derechos...
Страница 36: ...32 PV 212 Notice d emploi Fran ais 2005 Baker Hughes a GE Company Tous droits r serv s...
Страница 44: ...40 PV 212 Manuale d uso Italiano 2005 Baker Hughes a GE company Tutti i diritti riservati...
Страница 52: ...48 Manual de Instru o do PV 212 Portugu s 2005 Baker Hughes a GE Company Todos os direitos reservados...
Страница 53: ...Baker Hughes a GE company 2005 PV212 49 PV 212...
Страница 54: ...50 PV212 Baker Hughes a GE company 2005 www gemeasurement com C BSP COSHH F lb MSDS NPT psi...
Страница 55: ...Baker Hughes a GE company 2005 PV212 51 1 PV 212 2 BSP 1 1 2 3 4 5 6 7 8 9 10 11 NPT...
Страница 56: ...52 PV212 Baker Hughes a GE company 2005 2 1 BSP BSP BSP NPT 2 2 1 1 2 3 1 2 3 1 7 5 11 2 8 2 PV 212...
Страница 57: ...Baker Hughes a GE company 2005 PV212 53 NPT NPT 3 9 4 2 5 1 6 4 3 7 4 6 8 1 9 4 10 4 3 4 11 2 12 1 1...
Страница 60: ...56 PV212 Baker Hughes a GE company 2005...
Страница 61: ...2005 Baker Hughes a GE Company PV 212 57 PV 212...
Страница 67: ...2005 Baker Hughes a GE company PV 212 63 PV 212...
Страница 71: ...2005 Baker Hughes a GE company PV 212 67 9 4 10 4 3 4 11 2 12 1 1 1 4 1 1 2 10 3 7 4 PV 212 5...
Страница 73: ...2005 Baker Hughes a GE company PV 212 69 6 2 www gemeasurement com...
Страница 74: ...70 PV 212 2005 Baker Hughes a GE company...
Страница 75: ......