© 2005 Baker Hughes, a GE company – All rights reserved.
PV 212 Instruction Manual-English | 3
2. Operation
Note:
Wherever possible, use o-ring seals in the BSP connection ports this is the
recommended method of sealing.
Key to Figure #1
1.
Pressure release valve.
2.
Fine adjust vernier.
3.
Prime/High pressure selector.
4.
Scissor handles.
5.
Reservoir.
6.
Fluid inlet tube.
7.
Reservoir fill plug.
8.
Output port.
9.
Output port.
10. Rear port for an optional pressure relief valve. Do not use for other functions.
11. Recommended fluid level.
2.1 Connecting the Pump
BSP ports can be fitted with any suitable length ¼ BSP male connector, sealing either with an
o-ring at the bottom of the port or a bonded seal at the top. Adaptors are supplied to convert
the BSP ports to ¼ NPT. Fit a suitable blanking plug to an unused port.
2.2 Pressure Release Valve (Figure #1)
Use this (1) to reduce or release the pressure in the system. The amount of turn sets the rate
to release the pressure. Only minimum force is necessary to seal the system.
WARNING
Before applying pressure, make sure all connections are
correct and equipment is internally clean and free from damage.
Make sure that all equipment is to the correct pressure rating.
Do not exceed the maximum operating pressure stated in the specification.
Observe the relevant health and safety precautions.
CAUTION
If PTFE tape is used to seal NPT threads, ensure that only a
sufficient amount is used to achieve pressure seal. If excess tape is used,
particles can become loose during the connector mating process and enter
the pump, potentially leading to loss of pump performance or pressure
leaks.
Содержание Druck PV 212
Страница 2: ......
Страница 4: ...ii PV 212 Instruction Manual English 2005 Baker Hughes a GE company All rights reserved...
Страница 12: ...8 PV 212 Instruction Manual English 2005 Baker Hughes a GE company All rights reserved...
Страница 20: ...16 PV212 Bedienungsanleitung Deutsch 2005 Baker Hughes a GE Company Alle Rechte vorbehalten...
Страница 28: ...24 Manual de instrucciones PV 212 Espa ol 2005 Baker Hughes a GE Company Reservados todos los derechos...
Страница 36: ...32 PV 212 Notice d emploi Fran ais 2005 Baker Hughes a GE Company Tous droits r serv s...
Страница 44: ...40 PV 212 Manuale d uso Italiano 2005 Baker Hughes a GE company Tutti i diritti riservati...
Страница 52: ...48 Manual de Instru o do PV 212 Portugu s 2005 Baker Hughes a GE Company Todos os direitos reservados...
Страница 53: ...Baker Hughes a GE company 2005 PV212 49 PV 212...
Страница 54: ...50 PV212 Baker Hughes a GE company 2005 www gemeasurement com C BSP COSHH F lb MSDS NPT psi...
Страница 55: ...Baker Hughes a GE company 2005 PV212 51 1 PV 212 2 BSP 1 1 2 3 4 5 6 7 8 9 10 11 NPT...
Страница 56: ...52 PV212 Baker Hughes a GE company 2005 2 1 BSP BSP BSP NPT 2 2 1 1 2 3 1 2 3 1 7 5 11 2 8 2 PV 212...
Страница 57: ...Baker Hughes a GE company 2005 PV212 53 NPT NPT 3 9 4 2 5 1 6 4 3 7 4 6 8 1 9 4 10 4 3 4 11 2 12 1 1...
Страница 60: ...56 PV212 Baker Hughes a GE company 2005...
Страница 61: ...2005 Baker Hughes a GE Company PV 212 57 PV 212...
Страница 67: ...2005 Baker Hughes a GE company PV 212 63 PV 212...
Страница 71: ...2005 Baker Hughes a GE company PV 212 67 9 4 10 4 3 4 11 2 12 1 1 1 4 1 1 2 10 3 7 4 PV 212 5...
Страница 73: ...2005 Baker Hughes a GE company PV 212 69 6 2 www gemeasurement com...
Страница 74: ...70 PV 212 2005 Baker Hughes a GE company...
Страница 75: ......