IMPORTANCE OF PM SCHEDULE EXECUTION
Pulsar 150/180 DTS-i
Service Station Manual
61
Dealer Development Center
Akurdi Pune
CO% Setting
1. Readiness of CO gas analyzer
a. Ensure the machine is in well calibrated condition & calibration
certificate is available.
b. Switch ON & warm up the CO gas analyzer for its recommended
time.
c. Then carry out various tests such as leakage test, HC residue test,
IR zero test, oxygen censor test etc.
2. Readiness of the Vehicle
a. Warm up the engine. Run the vehicle on MRTB or drive the vehicle
for about 3 ~ 4 kms on road.
b. After warm up, check the engine oil temperature by dipping the probe of
temperature indicator in the oil through oil filler cap.
It must be 60 c.
0
3. Check & set engine idling RPM with the use of digital tachometer to
1400 100 by adjusting idling screw.
+
4. Remove bolt & washer fitted to the silencer nozzle near to ExhausTEC.
5. Connect silicon tube of CO gas analyzer probe to the nozzle.
6. Note the CO when reading on LCD screen of the analyzer stabilizes.
Содержание pulsar DTS-i
Страница 1: ...Service Station Manual Service Station Manual...
Страница 5: ...Foreword 1 sm pt...
Страница 7: ...Workshop Safety 3 vk Si p s fT...
Страница 11: ...General Information Before Servicing 7 jnrl vgt s v s ph li...
Страница 18: ...NOTES Pulsar 150 180 DTS i Service Station Manual 14 Dealer Development Center Akurdi Pune...
Страница 26: ...NOTES Pulsar 150 180 DTS i Service Station Manual 22 Dealer Development Center Akurdi Pune...
Страница 88: ...Notes Pulsar 150 180 DTS i Service Station Manual 84 Dealer Development Center Akurdi Pune...
Страница 160: ...Pulsar 150 180 DTS i Service Station Manual 156 Dealer Development Center Akurdi Pune Notes...
Страница 216: ...Pulsar 150 180 DTS i Service Station Manual 212 Dealer Development Center Akurdi Pune Notes...
Страница 250: ...Pulsar 150 180 DTS i Service Station Manual 246 Dealer Development Center Akurdi Pune Notes...
Страница 251: ...Diagnosis Troubleshooting 247 p iblm Si Fvi an t n nrikrN...