Commissioning/Decommissioning
03|2022
EN 49
6
Commissioning/Decommissioning
6.1
Commissioning
NOTICE
The pump may not be turned on if there is no guarantee that the
BADU OmniTronic will take control of the pump. It must also be
ensured that the pump does not turn on when the valve is turning.
Î
Close the transparent lid bevor the device is connected to the
power supply.
6.1.1 Switching on
Do not switch on the device until the drive box is fully connected
to the electronics.
Î
The screws of the lid must be firmly tightened so that the
correct distance from the keyboard is kept.
Î
Fit the lid carefully and in the correct position so that the
keyboard is not damaged.
6.2
Functional test
6.2.1 Test cycle
Once the supply voltage has been applied and the control has
been turned on with the illuminated rocker switch, the device runs
a test cycle. This ends in the position “Filter”. Then the device is
ready for operation.
6.2.2 Shut-off valves
The integrated shut-off valves in the control connection lines must
be opened completely.
Содержание OmniTronic
Страница 3: ...DE Originalbetriebsanleitung OmniTronic WG26 150 010 P...
Страница 66: ......
Страница 67: ...EN Translation of original operation manual OmniTronic WG26 150 010 P...
Страница 126: ......
Страница 127: ...FR Traduction des instructions d utilisation originale OmniTronic WG26 150 010 P...
Страница 193: ...NL Vertaling van de oorspronkelijke gebruikershandleiding OmniTronic WG26 150 010 P...
Страница 256: ......
Страница 257: ...IT Traduzione del manuale d istruzioni originali OmniTronic WG26 150 010 P...
Страница 321: ...ES Traducci n de las instrucciones originales para el manejo OmniTronic WG26 150 010 P...