03|2022
EN 5
5
Installation ..................................................................................... 39
5.1
Installation site .......................................................................... 39
5.1.1
Installation ............................................................................. 39
5.1.2
Temperature differences ....................................................... 39
5.1.3
There must be ground drainage ........................................... 39
5.1.4
Ventilation and aeration ........................................................ 39
5.1.5
Reserve space ...................................................................... 39
5.1.6
Cable laying/line laying ......................................................... 39
5.2
Installation ................................................................................. 40
5.2.1
Connecting the valve to the pipework ................................... 41
5.3
Electrical connection (Qualified specialist) ............................... 42
5.3.1
Replacing the fuses .............................................................. 43
5.3.2
Terminal connection table ..................................................... 43
5.3.3
Connection diagram .............................................................. 44
5.3.4
Connection diagram for the BADU Prime pump and KNX
adapter .................................................................................. 45
5.3.5
Connection diagram for the BADU VS pump and external
filter control............................................................................ 45
5.3.6
Connection diagram for float switch and magnetic valve ..... 46
5.3.7
Connection diagram in connection with BADU Eco Drive II
frequency converter .............................................................. 46
5.3.8
Connection diagram for a ball valve for solar application via
multifunction relay z7-z8 ....................................................... 47
5.3.9
Connection diagram for an alarm generator in the case of
water on the cellar floor ......................................................... 47
5.3.10
Connection diagram for BADU VS-pump,
BADU OmniTronic and pool cover ........................................ 48
5.3.11
Connection diagram for wiring three-phase current to
alternating current switch box ............................................... 48
6
Commissioning/Decommissioning ............................................ 49
6.1
Commissioning ......................................................................... 49
6.1.1
Switching on.......................................................................... 49
6.2
Functional test .......................................................................... 49
6.2.1
Test cycle .............................................................................. 49
6.2.2
Shut-off valves ...................................................................... 49
7
Faults/troubleshooting ................................................................ 50
7.1
Overview ................................................................................... 50
Содержание OmniTronic
Страница 3: ...DE Originalbetriebsanleitung OmniTronic WG26 150 010 P...
Страница 66: ......
Страница 67: ...EN Translation of original operation manual OmniTronic WG26 150 010 P...
Страница 126: ......
Страница 127: ...FR Traduction des instructions d utilisation originale OmniTronic WG26 150 010 P...
Страница 193: ...NL Vertaling van de oorspronkelijke gebruikershandleiding OmniTronic WG26 150 010 P...
Страница 256: ......
Страница 257: ...IT Traduzione del manuale d istruzioni originali OmniTronic WG26 150 010 P...
Страница 321: ...ES Traducci n de las instrucciones originales para el manejo OmniTronic WG26 150 010 P...