73
3/4"
(1,9 cm)
Gauge
Block
Fig. A
Fig. B
Fig. B
Flush with
eave frame
Flush with
eave frame
Fig. C
Two Nails
Two Nails
At the outside edge, move the gable side-to-side until
the edge of the panel is flush with the outer gable frame
(Fig C)
.
Secure with (2) 2" nails.
2
Install the
32-5/8 x 75-1/4"
roof panel as shown.
Use a gauge block to ensure the panel measures 3/4" (1,9 cm) along the length
of the rafter
(Fig. A)
.
Panel should be flush with eave frame
(Fig. B)
.
Secure with (2) 2" nails.
Flush
Flush
32-5/8" x 75-1/4"
▪ Roof panels may cause serious injury until securely fastened.
▪ Install all roof panels with the grid lines facing up (rough side).
2" (5,1 cm)
PARTS REQUIRED:
x251
3/4" GAUGE
BLOCK
7/16 x 32-5/8 x 75-1/4"
(1,1 x 82,9 x 191,1 cm)
x1
1
BEGIN
ROOF PANELS
Содержание GABLE 10 x 12