119
You have finished shingling your roof. Proceed to capping the ridge.
FINISH
Continue installing rows of shingles to the peak. At the peak make sure there is a maximum of 5" or less to the rain slot, as
shown below. If shingles overlap at ridge cut to peak with a utility knife.
Repeat STEPS 1 - 5 to shingle the opposite side of your roof. Trim shingles at ridge.
Once both sides are shingled you need to trim ends. Strike a chalk line 1" from edge.
Using your shingle hooked blade carefully cut shingles along chalk line.
5
6
7
8
SHINGLES
continued...
• If more than 5" to rain slot you must install another row of shingles.
5"
(12,7 cm)
or less.
5"
(12,7 cm) MAX.
Top of rain slot.
Cut Off.
CUT
Содержание GABLE 10 x 12
Страница 2: ...Continued from PART 1 page 58...