90
Flush to wall.
Fig. C
Flush at peak.
Fig. D
8"
(20,3 cm)
Flush to wall.
Fig. A
Fig. B
8"
(20,3 cm)
2" (5,1 cm) Nails
x12 per side
Line-up at
center seam.
Install right
73-5/16"
overhang board flush to front wall
(Fig A)
and flush to gable frame seam
(Fig B)
.
Secure with (12) 2" finishing nails.
Install left
73-5/16"
overhang board
flush to front wall
(Fig C)
, and flush to right overhang board
(Fig. D)
.
Secure with (12) 2" finishing nails.
Repeat STEPS 1 - 2 to attach soffit boards on the opposite side.
Install all soffit boards with the primed side facing down.
Ensure soffit boards are lined-up at seam (Fig. B) and at peak (Fig. D)
.
2
1
BEGIN
Your soffit panels are now installed.
FINISH
PARTS REQUIRED:
GABLE END SOFFITS
x4
3/8 x 7-7/8 x 73-5/16" (1 x 20 x 186,2 cm)
x72
2" (5,1 cm)
Содержание GABLE 10 x 12
Страница 2: ...Continued from PART 1 page 58...