PARTS REQUIRED:

1" (2,5 cm)

x2

x8

5/16" (0,8 cm) Drill Bit

DOOR HARDWARE

BEGIN

Install bolt with screws supplied and drill 5/16" hole for bolt to extend into.

Install bolt with screws supplied and drill 5/16" hole for bolt to extend into.

Place bolt on 

OO

 in open position with bolt end 1/2" up from floor. 

Bolt is open when loop is contacting base 

(Fig B)

.

3

4

2

Place spring bolt on 

OO

 in open position with bolt end 3/8" down from frame. 

Bolt is open when loop is contacting base 

(Fig A)

.

Mark and pre-drill holes for screws.

Mark and pre-drill holes for screws.

1

LEFT 

DOOR

Fig. B

Your spring bolts are now installed.

Fig. A

FLOOR

Loop contacts 

base.

x4

x4

1/2"

5/16" drill for

bolt: 1" deep.

Loop contacts 

base.

PRE-DRILL

(4) HOLES

PRE-DRILL

(4) HOLES

69” (175,3) Door 

Stiffener 

69” (175,3) 

Door Stiffener 

3/8" with bolt in open 

        position.

OPEN POSITION, 

Spring is loose.

OPEN POSITION, 

Spring is loose.

5/16" drill for bolt:

1" deep.

OVER DOOR FRAME

OO

OO

LOCATE AND PRE-DRILL HOLES TO AVOID SPLITTING WOOD

FINISH

Содержание GABLE 10 x 12

Страница 1: ...02 28 2021 KEEP THIS MANUAL FOR FUTURE REFERENCE ACTUAL FLOOR SIZE IS 120 x 144 304 8 x 365 8 cm 16519 continued from PART 1 GABLE 10 x 12 305 x 366 cm DOOR LOCATION OPTION PART 2...

Страница 2: ...Continued from PART 1 page 58...

Страница 3: ...Place middle gable panel flush to left panel Ensure panels are flush Secure panel to installed AFC with 1 1 2 nails Place second AFC as shown under middle panel and secure with 1 1 2 nails spaced eve...

Страница 4: ...Turn the gable frame over and attach FLM to CLA with 2 3 screws Fig B Repeat STEPS 1 2 to build 3 additional gable overhang assemblies Repeat STEP 3 to build another gable frame assembly Fasten the tw...

Страница 5: ...units Fig E Fig F Flush Flush Flush Flush 3 7 6 cm Screws Install 2 parts GPC as shown and secure each with 2 3 screws Fig F Repeat STEPS 5 6 to complete another gable unit Flush FINISH You now have...

Страница 6: ...own Your gable units are now installed FINISH On the inside secure gable unit with 3 screws into RL Fig B 4 3 2 5 1 cm x46 Repeat STEPS 1 4 to attach back gable unit Fig B TOP PLATE Measure 1 1 2 down...

Страница 7: ...ligned over stud and at 23 5 8 measurement from inside of gable panel Ensure rafter notch is tight to gable wall Fig B Fig C Secure rafter with 2 3 screws as shown Fig A Fig B Fig C MEASURE FROM INSID...

Страница 8: ...each mark Install parts CTZ and CWG with 2 3 nails at each location shown 2 CWG x6 34 7 8 88 6 cm 84 3 8 214 3 cm 58 7 8 149 5 cm 9 3 8 23 8 cm HINT For easier nailing stand on frame CTZ CTZ x42 3 7 6...

Страница 9: ...h Install dormer panels primed side out resting on top plate and flush along bottom of rafter edge Secure with 1 1 2 nails spaced evenly as shown x14 1 1 2 3 8 cm F l u s h 1 1 2 3 8 cm Nails Left Pan...

Страница 10: ...l frame is flush to front edges of installed dormer panels Fig C Secure with 3 nails into top plate and 1 1 2 nails at side panels as shown x1 Pre assembled dormer wall frame x8 3 7 6 cm Flush Flush F...

Страница 11: ...rmer panel primed side out and flush on top of wall panels Ensure front dormer panel is flush with side panels along edge Fig E 3 2 5 1 cm x52 2 5 1 cm Nails Flush Flush Flush Flush Fig E Front Dormer...

Страница 12: ...alled rafter Fig F Fig G 4 x12 1 1 2 3 8 cm 1 1 2 3 8 cm Nails spaced evenly 3 7 6 cm Screws 3 7 6 cm Screws 3 7 6 cm Screws Fig F LEFT Rafter x1 gusset RIGHT Rafter x1 gusset Flush 1 1 2 3 8 cm Nails...

Страница 13: ...er on dormer frame and back wall top plate Fig D Fig G Align rafter over back wall stud and at 45 3 8 115 3 cm measurement from inside of rafter Fig D 5 Measurement to inside of rafter Measurement to...

Страница 14: ...as shown Ensure soffit unit is flush with rafter ends Secure with 3 screws in the ends of UN and soffit blocks KDA Secure UN with 4 screws evenly spaced and angled into wall top plate as shown below...

Страница 15: ...h to soffit frame center and gable outer framing as shown Attach at center first Secure with 3 screws Ensure flush to top of rafters and gable framing Continue fastening XMB with 3 screws into ends of...

Страница 16: ...Ensure flush to top of rafters and gable framing Continue fastening XMB with 3 screws into rafter ends and gable framing Ensure flush to top of rafters and gable framing 4 3 Flush to top Flush to top...

Страница 17: ...32 5 8 x 75 1 4 roof panel as shown Use a gauge block to ensure the panel measures 3 4 1 9 cm along the length of the rafter Fig A Panel should be flush with eave frame Fig B Secure with 2 2 nails Fl...

Страница 18: ...ner 6 48 x 96 Flush 2 Nails Flush Flush 7 16 x 27 1 4 x 96 1 1 x 69 2 x 243 8 cm x1 3 4 1 9 cm Fig D Gauge Block Flush Flush 4 Install the 27 1 4 x 96 roof panel as shown Use a gauge block to ensure t...

Страница 19: ...cm 24 61 cm 24 61 cm 24 61 cm 24 61 cm 3 4 1 9 cm Gauge Block Move the gable unit to make panel flush with outer gable frame edge Fig F 2 5 1 cm Nails 8 Install the next 32 5 8 x 75 1 4 roof panel as...

Страница 20: ...76 Secure all roof panels with 2 nails spaced 6 apart on edges and 12 apart inside panel All panels are installed on the main roof PARTS REQUIRED ROOF PANELS FINISH 6 15 2 cm 12 30 5 cm 9...

Страница 21: ...75 1 4 panel Flush with eave frame Fig A 3 3 3 8 x 7 5 1 4 7 7 8 x 94 1 2 Roof panels may cause serious injury until securely fastened Install all roof panels with the grid lines facing up rough side...

Страница 22: ...g nails as shown Trim felt around OSB window openings Flash the front of dormer using 4 4 x 32 flash cards Overlap ends of flashing 2 Extend flashing 3 past corner of dormer Trim flashing corner ends...

Страница 23: ...d to complete your dormer FINISH x40 1 GALVANIZED ROOFING NAILS PARTS REQUIRED DORMER FLASHING SHINGLES Trim bend and nail a 5 x 7 flashing at the dormer corner Fig B Secure flashing with 1 nails Lay...

Страница 24: ...2x6 parts at connection and adjust panel to 3 5 16 8 4 cm measurement at each side of panel as shown Panel should be flush to 2x6 parts along edge Secure panel with 6 1 5 8 screws in a staggered patte...

Страница 25: ...ffit assembly 1 BEGIN Orient parts as shown on a flat surface Slide part QNR until angle meets the corner of KNA Fig A x1 QNL 19 32 x 3 1 2 x 58 5 8 1 5 x 8 9 x 148 9 cm x1 QNR 19 32 x 3 1 2 x 58 5 8...

Страница 26: ...de Fig A VV is flush against front dormer panel Mark rafter locations on dormer panel Secure roof panel with 2 nails spaced 6 apart along panel edges and 12 apart inside of panel Roof panels may cause...

Страница 27: ...spaced 6 apart along panel edges and 12 apart inside of panel PARTS REQUIRED DORMER ROOF 2 5 1 cm x19 7 16 x 19 7 8 x 96 1 1 x 50 5 x 243 8 cm x1 6 15 2 cm Flush 2 5 1 cm Nails 12 30 5 cm Install the...

Страница 28: ...flush with front soffit board Fig B 6 Secure SOFFIT UNIT with 2 screws Fig C Toe screw soffits together with 3 screws Fig B Repeat STEPS 5 and 6 for opposite side soffit unit x4 2 5 1 cm Screws x1 Pr...

Страница 29: ...1 2 dormer roof panels on either side of installed dormer roof panels Hold flush to front and along panel seam Secure with 1 5 8 screws in a staggered pattern as shown 7 16 x 3 7 16 x 64 1 2 1 1 x 8 7...

Страница 30: ...x 43 13 16 5 1 x 10 2 x 111 3 cm WJA MHR x1 19 32 x 2 1 2 x 64 1 2 1 5 x 6 3 x 163 8 cm MHL x1 19 32 x 2 1 2 x 64 1 2 1 5 x 6 3 x 163 8 cm Your dormer fascia trim is now installed FINISH 2 Secure wit...

Страница 31: ...g 4 3 4 screws per window Your dormer windows are now installed FINISH Repeat step to install MFL flush to QNL 1 BEGIN Place MFR flush to QNR and front dormer panel Fig A Secure with 2 finishing nails...

Страница 32: ...o install AML on dormer left side Repeat STEP 2 to install dormer trim AML on the left side of dormer PARTS REQUIRED 1 1 4 3 2 cm Screws AMR AML DORMER TRIM x1 AMR 19 32 x 2 1 2 x 46 9 16 1 5 x 6 3 x...

Страница 33: ...front soffit and MEA Secure with 2 finishing nails Place second MEA flush with HOA and AML Secure with 2 finishing nails 3 Install all dormer trim parts with primed side facing out Your dormer trim i...

Страница 34: ...ils Install left 73 5 16 overhang board flush to front wall Fig C and flush to right overhang board Fig D Secure with 12 2 finishing nails Repeat STEPS 1 2 to attach soffit boards on the opposite side...

Страница 35: ...rafter ends Fig C and flush at seams x2 3 8 x 5 7 8 x 72 3 4 1 x 14 9 x 184 8 cm x18 2 5 1 cm 1 BEGIN Fig A 2 5 1 cm Finishing Nails Flush Fig C Fig B Flush Angle nails at seam Starting at the center...

Страница 36: ...boards flush together Fig A Angle nails at center seam Fig B Secure with 2 finishing nails as shown Ensure soffit boards are flush at rafter ends Fig C and flush at seams x2 3 8 x 5 7 8 x 72 3 4 1 x...

Страница 37: ...inished installing your gable fascia FINISH Fig A Fig B Flush Flush at peak SPACED EVENLY Flush with top of OSB roof panels 2 5 1 cm Finishing Nails x10 per Fascia Hint Pre set nails in fascia before...

Страница 38: ...nter rafter as shown Fig A Secure with 2 finishing nails evenly spaced at shown locations 1 BEGIN PARTS REQUIRED x2 3 8 x 4 3 4 x 72 1 x 12 1 x 182 9 cm Install all fascia boards with the primed side...

Страница 39: ...d x1 Right Door Assembled x2 1 5 8 4 1 cm OO GAA 4 3 7 6 cm Screws 1 5 8 4 1 cm Screws 3 8 1 cm 3 8 1 cm RED Bottom edges Flush GREEN 3 8 1 cm OFFSET OFFSET 3 8 1 cm Orient parts as shown on flat surf...

Страница 40: ...talling your doors Screw hinge boards into wall supports with 10 3 screws as shown Make sure screws go into framing 4 OO TEMPORARY SUPPORT SEAM 3 8 1 cm Fig B 4 3 7 6 cm Screws into door stud 2 3 7 6...

Страница 41: ...pening Fig B FA 11 1 4 28 6 cm DOOR TRIM PARTS REQUIRED 3 4 1 9 cm x56 x5 2 5 1 cm x4 19 32 x 2 1 2 x 22 5 8 2 5 x 6 3 x 57 5 cm FA x1 19 32 x 2 1 2 x 63 2 5 x 6 3 x 160 cm WR 1 2 Attach horizontal do...

Страница 42: ...grade caulk behind frame near edge before installing to seal window 3 4 1 9 cm Screws x8 Your transom windows are installed FINISH 3 4 1 9 cm x8 x2 BACK SIDE OF DOORS Center window on mark FRONT SIDE...

Страница 43: ...enter OO in door opening OO x2 69 175 3 Door Stiffener OO x2 3 4 1 9 cm 3 4 1 9 cm OFFSET Screws 2 5 1 cm Fig B IT IS IMPORTANT TO HOLD THESE DIMENSIONS 2 5 1 cm Screws x14 FINISH BEGIN 1 Center OO s...

Страница 44: ...osition with bolt end 3 8 down from frame Bolt is open when loop is contacting base Fig A Mark and pre drill holes for screws Mark and pre drill holes for screws 1 LEFT DOOR Fig B Your spring bolts ar...

Страница 45: ...rews 2 FINISH RIGHT DOOR 1 3 4 4 4 cm TOP VIEW 1 4 Pre drill and 3 8 Drill through DOOR HARDWARE DECORATIVE HINGES x1 3 4 1 9 cm x12 x4 PARTS REQUIRED x2 1 1 2 3 8 cm Re drill hole with 3 8 drill Keep...

Страница 46: ...1 2 finishing nail at top as shown Repeat STEPS 1 2 to install trim at all 4 corners Secure trim flush to corners Fig A with 6 2 finishing nails evenly spaced as shown Your corner trim is now install...

Страница 47: ...RL on a flat surface Hold parts TP and RL flush and aligned 1 3 4 4 4 cm 1 3 4 4 4 cm 2 Assemble joist with 3 nails in a staggered pattern Turn assembled joist over and repeat staggered nail pattern...

Страница 48: ...cm Hex Bolt Flat Washer Lock Nut NOT ACTUAL SIZE 4 5 Clamp or hold Pre Assembled Loft Joist in place flush against 1st studs from back wall Ensure Pre Assembled Loft Joist is flush beneath top plates...

Страница 49: ...to exceed 400 lbs 181 kg evenly distributed across loft FINISH You have finished installing your Loft 8 20 3cm 2 5 1 cm Nails Flush Flush 6 Install loft panel centered over loft joists Secure with 2 5...

Страница 50: ...with 3 2 5 1 cm nails 1 BEGIN 2 x36 2 5 1 cm 3 8 x 7 1 2 x 10 1 8 1 x 19 1 x 25 7 cm x6 2 x 3 x 6 5 8 5 1 x 7 6 x 16 8 cm PHA x6 PARTS REQUIRED PHA x5 x1 2 5 1 cm Nail Flush Flush Flush 56 142 2 cm LE...

Страница 51: ...nails at each support as shown 3 FINISH You have finished installing your shelves 4 x28 2 5 1 cm 7 16 x 7 7 8 x 23 7 8 1 1 x 20 x 60 6 cm x1 7 16 x 7 7 8 x 96 1 1 x 20 x 243 8 cm x1 1 x 4 x 23 7 8 2 5...

Страница 52: ...ush FLOOR BACK WALL Secure LMA to bracket panels with 3 2 nails Assemble 6 shelf supports as shown 5 right side 1 left side Secure work bench supports at shown height with 3 2 5 1 cm nails 2 WORK BENC...

Страница 53: ...1 cm nails at each support as shown 4 PARTS REQUIRED x35 2 5 1 cm 7 16 x 20 3 4 x 20 1 2 1 1 x 52 7 x 52 1 cm x1 7 16 x 20 3 4 x 92 1 2 1 1 x 52 7 x 235 cm x1 1 x 4 x 23 7 8 2 5 x 10 2 x 60 6 cm JS x1...

Страница 54: ...tter parts EHT primed side down on floor as shown Your 2 window shutters are assembled 2 Fasten slats RGD to EHT with 1 screws Allow 7 16 1 1 cm gap between RGD RGD x3 RGD x3 Flush Flush 7 16 1 1 cm G...

Страница 55: ...d windows to validate your warranty BEGIN 1 Seal window by caulking behind frame with high quality exterior grade caulk before installing Secure window with 4 1 5 8 screws as shown Ensure window is le...

Страница 56: ...ANSOM WINDOWS x12 3 4 1 9 cm Your transom windows are now installed FINISH BEGIN 1 You must caulk around windows to validate your warranty Seal windows with high quality exterior grade caulk before in...

Страница 57: ...lower window and mark as shown Align RNA to mark and install level and centered over windows Secure with 2 finishing nails into wall framing Install 2 IDA flush to RNA and with 22 1 4 56 5 cm between...

Страница 58: ...th 2 finishing nails Install 2 shutters flush to RNA and flush to FF as shown Secure with 2 finishing nails into wall framing Secure outside edge of shutters with 2 finishing nails angled into the wal...

Страница 59: ...115 x2 GABLE VENTS PARTS REQUIRED FINISH BEGIN 1 Install 1 vent in each gable Caulk behind vent flanges Your gable vents are installed Secure with 1 screws x8 1 2 5 cm...

Страница 60: ...Follow directions provided by manufacturer Snip bottom side of drip edge and bend over to other side of roof Follow directions provided by manufacturer PAINT CAULK NOT INCLUDED ROOF FELT NOT INCLUDED...

Страница 61: ...ross with lower edge of roof deck NOTE If you have installed drip edge install shingles flush to drip edge BEGIN 1 TABS UP Shingle overlaps roof decking 1 2 5 cm overhang past roof deck 1 2 5 cm overh...

Страница 62: ...Roof Deck 1 2 5 cm Flush with starter row Flush with starter row Continue installing rows of shingles by staggering at front 4 SHINGLES continued Install second row of shingles flush at top of first r...

Страница 63: ...t ridge cut to peak with a utility knife Repeat STEPS 1 5 to shingle the opposite side of your roof Trim shingles at ridge Once both sides are shingled you need to trim ends Strike a chalk line 1 from...

Страница 64: ...cut off pieces first Score shingle then snap off angled cut Install first ridge cap flush to shingles at front as shown Install second ridge cap 5 back as shown 2 3 BEGIN 1 2 5 cm 2 5 cm 2 5 cm 2 5 cm...

Страница 65: ...s 4 between the shingle color and edge of shingles When you have 4 minimum of shingle color cut 1 piece to cap your roof Install flush to shingles 4 5 6 7 2 Nails per side You have finished your ridge...

Страница 66: ...siding trim and OSB siding to include all exterior walls and all sides and all edges of doors Gazebos Pergolas To validate your warranty it is necessary to properly maintain your Backyard Storage Solu...