0644LOG213-V4(4x3m)
0644LOG213-V4: 4x3m reverse apex cabin (
44mm
)
2mm Drill bit
Winter = High Moisture = Expansion
Summer = Low Moisture = Contraction
All buildings should be
erected by two adults
For ease of assembly, you
MUST pilot drill all screw
holes and ensure all screw
heads are countersunk.
For assistance please contact customer care on: 01636 821215
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
www.merciagardenproducts.co.uk
CAUTION
Every effort has been made during the
manufacturing process to eliminate the
prospect of splinters on rough surfaces of the
timber. You are strongly advised to wear gloves
when working with or handling rough sawn
timber.
Please retain product label and instructions for future reference
General Instructions
BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed.
- When you are ready to start, make sure you have the right tools at hand (not supplied)
including a Phillips screwdriver, Stanley knife, wood saw, step ladder and drill with 2mm
bit.
- Ensure there is plenty of space and a clean dry area for assembly.
TIMBER
As with all natural materials, timber can be affected during various weather conditions.
For the duration of heavy or extended periods of rain, swelling of the wood panels may
occur. Warping of the wood may also occur during excessive dry spells due to an interior
moisture loss. Unfortunately, these processes cannot be avoided but can be helped. It is
suggested that the outdoor building is sprayed with water during extended periods of
warm sunshine and sheltered as much as possible during rain or snow.
BUILDING A BASE
When thinking about where the building and base are going to be constructed:
Ensure that there will be access (60cm) to all sides for maintenance work and annual
treatment.
Ensure the base is level and is built on firm ground, to prevent distortion. Refer to
diagrams for the base dimensions. The base should be slightly smaller than the external
measurement of the building, i.e. The cladding should overlap the base, creating a run
off for water. It is also recommended that the floor be at least 25mm above the
surrounding ground level to avoid flooding.
TYPES OF BASE
- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
Whilst all products manufactured are made to the highest standards of Safety and in
the case of childrens products independently tested to EN71 level, we cannot accept
responsibility for your safety whilst erecting or using this product.
Refer to the instructions pages for your specific product code
For ease of assembly use a
rubber mallet to fit the log
boards. Do NOT use a heavy
hammer.
Ensure to measure and check before cutting
boards.
It is advisable to use a hand
saw when cutting roof and
floor boards.
To ensure log boards are even, use a spirit
level to check each layer has been installed
correctly.