It is ESSENTIAL that you apply wood
treatment immediately after the building
has been assembled.
P 11
Please retain product label and instructions for future reference
Step 17
Parts needed - No. 22 QTY 8
Arrange the storm braces (
No. 22
)
around the building (
internally
).
Place 2x storm braces per side fixing
into place using 2x90mm bolts per
brace making sure the washer & nut
are tightened from the outside of the
building.
*Ensure the storm braces are
secured at the highest point possible
on each side.
**Storm braces will help your
building expand and contract
properly.
***Important: Ensure each bolt is
tightened using a washer so as not
to damage the log boards.
16x90mm Bolt Sets
Pre drill
hole
90mm
bolt
22
22