background image

It is ESSENTIAL that you apply wood 

treatment immediately after the building 

has been assembled.

P 11

Please retain product label and instructions for future reference

             

Step 17

Parts needed - No. 22 QTY 8 

Arrange the storm braces (

No. 22

)

around the building (

internally

). 

Place 2x storm braces per side fixing 

into place using 2x90mm bolts per 

brace making sure the washer & nut 

are tightened from the outside of the 

building.

*Ensure the storm braces are 

secured at the highest point possible 

on each side.

**Storm braces will help your 

building expand and contract  

properly.

***Important: Ensure each bolt is 

tightened using a washer so as not 

to damage the log boards.

16x90mm Bolt Sets

Pre drill 

hole

90mm

bolt

22

22

Содержание 0644LOG213-V4

Страница 1: ...ur during excessive dry spells due to an interior moisture loss Unfortunately these processes cannot be avoided but can be helped It is suggested that the outdoor building is sprayed with water during extended periods of warm sunshine and sheltered as much as possible during rain or snow BUILDING A BASE When thinking about where the building and base are going to be constructed Ensure that there w...

Страница 2: ...497mm QTY 28 LB44 B 1497 14 Roof Board 121x16x1600mm QTY 72 MB16 1600 15 Floor Board 121x16x2715mm QTY 34 MB16 2715 16 Bearer 44x58x2814mm QTY 2 F4458 2814 PT 17 Bearer 44x58x3691mm QTY 10 F4458 3691 PT 18 Purlin 45x120x4004mm QTY 3 F45120 A 4004 19 Eaves 44x27x4004mm QTY 2 F2744 4004 21 Fascia 16x120x1604mm QTY 4 S16120 1604 angled 10 Log Board 120x44x2996mm QTY 4 LB44 A 2996 11 Log Board 120x44x...

Страница 3: ...erlocks at either end in a staggered pattern Before securing ensure that the boards are fitted properly in their respective tongues and grooves Nail Bag 40mm Screw x536 30mm Screw x72 P 3 Please retain product label and instructions for future reference 90mm Bolt Set x16 ...

Страница 4: ...e Pre Assembly Parts needed No 4 QTY 2 No 10 QTY 2 Place the boards No s 4 11 on to the assembled base frame along the longest sides Ensure the notches at either end of each board are flush and level with the ends of the frame Fix each of the starter boards to the frame by screwing through the notch into the frame as shown in the illustration 4x70mm Screws IMPORTANT Pre drill before fixing screws ...

Страница 5: ...for illustrative purposes and may differ from your choice in product regard ing door position Nevertheless the process of fitting the door frame is the same Please Note The short boards at the front of the building either side of the door and window opening s can be placed either side depending on your needs Step 5 See Pre Assembly Parts needed No 5 QTY 14 No 6 QTY 14 No 7 QTY 7 No 8 QTY 14 No 9 Q...

Страница 6: ...n product regarding window position Nevertheless the process of fitting the window is the same Step 7 See Pre Assembly Parts needed No 6 QTY 14 No 7 QTY 7 No 8 QTY 14 No 9 QTY 14 No 12 QTY 2 No 13 QTY 1 Following the same method outlined in Pre Assembly lay the remaining boards No s 6 7 8 9 12 13 onto the assem bly to bring the board level to the top of the window and door frames Ensure that the b...

Страница 7: ...rill hole Step 9 Parts needed No 18 QTY 3 Align the Purlin s No 18 into the cut out slots on each gable top ensuring each purlin interlocks the boards Secure the Purlins at each end by screwing through the bars into the boards ensure to pre drill to avoid the boards splitting using 4x70mm screws per purlin Please note The gable shown is for illustrative purposes and may differ in width from your c...

Страница 8: ...t at the top of the apex The last board on each side will overhang Using a straight edge and a pencil mark out a line as a guide Cut along the pencil mark and remove the excess Place the cut down board s back onto the roof and secure into place using 3x40mm screws per board Please Note This image is for illustrative purposes and may differ from your choice in product Never theless the process of c...

Страница 9: ...gh each of the floor boards into the floor bearers 272x40mm Screws 40mm screw Pre drill hole Cut to fit Roof Closure Trim Internal 23 Measure and cut the closure trims to fit the internal space 23 23 Roof Closure Trim Internal 23 Measure and cut the closure trims to fit the internal space 23 23 Pre drill hole 30mm screw trim to fit Step 13 Parts needed No 23 QTY 6 Inside the building place the clo...

Страница 10: ...e there is approximately 50mm of overhanging felt each side Once the felt is laid out fix to the roof using felt tacks at 100mm intervals Felt size 4132mm 252x Felt Tacks Step 16 Parts needed No 20 QTY 2 No 21 QTY 4 Align the fascia s No 20 No 21 with the roof and fix into place using 3x40mm screws per fascia making sure to screw through the fascia into the roof purlinsand eaves frame Ensure the a...

Страница 11: ...ng internally Place 2x storm braces per side fixing into place using 2x90mm bolts per brace making sure the washer nut are tightened from the outside of the building Ensure the storm braces are secured at the highest point possible on each side Storm braces will help your building expand and contract properly Important Ensure each bolt is tightened using a washer so as not to damage the log boards...

Отзывы: