P 9
Please retain product label and instructions for future reference
15
Step 12
Parts needed - No. 15 QTY 34
Place the first Floor Board (
No. 15
)
inside the building flush to the log
board on one side. Continue adding
the floor boards (
internally
) making
sure to interlock each individual
board.
*Do
NOT
secure the boards until
the last board has been measured
and cut.
Following the same method outlined
previously, measure the gap between
the bottom of the tongue (
on the last
board placed
) and the log board.
Using a straight edge mark out the
measurement onto the last floor
board (
No. 15
) and cut along the
length removing the excess.
**Please note:
Mark the final board
2mm under the measurement; This
will allow the timber to expand and
contract correctly.
Once all the floor boards are in
position secure each board into
position using 8x40mm screws.
***Please Note:
Ensure to screw
through each of the floor boards
into the floor bearers.
272x40mm Screws
40mm
screw
Pre drill
hole
*Cut to fit
Roof
Closure Trim
Internal
23
*Measure and cut the
closure trims to
fit the internal space.
23
23
Roof
Closure Trim
Internal
23
*Measure and cut the
closure trims to
fit the internal space.
23
23
Pre drill
hole
30mm
screw
*trim to fit
Step 13
Parts needed - No. 23 QTY 6
Inside the building place the closure
trim (
No. 23
) against the boarding
and align with the roof as shown in
the illustration.
Once in position fix each trim
into place by pre drilling a pilot hole
and using 6x30mm screws per trim,
equally spacing them along the face
of the board
36x30mm Screws
30mm
screw
Pre drill
hole
*Cut to fit
Step 14
Parts needed - No. 23 QTY 6
Once the floor has been laid arrange the
closure trim (
No. 23
) around the outside
edge of floor (
internally
), measure and cut
down accordingly to best match the
internal space.
Secure each trim section into place using
6x30mm spaced equally along the board
as shown in the illustration.
*Do NOT fix the closure trim to the floor
boards.
36x30mm Screws