
Example picture
2 screws per bearer per end.
P 4
For assistance please contact customer care on: 01636 821215
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
www.merciagardenproducts.co.uk
Please retain product label and instructions for future reference
16
16
17
16
17
17
17
17
17
17
17
17
17
17
17
Pre drill
hole
70mm
screw
Step 1
Parts needed - No. 16 QTY 2
No. 17 QTY 10
Lay the bearers (
No’s 16
& 17
) onto a firm and level
surface (
free from areas where
standing water can collect
) as
shown in the illustration.
Fix the framing together at
each corner using 8x70mm
screws, ensuring the frame is
flush.
8x70mm Screws
4
4
4
10
10
Pre drill
hole
70mm
screw
Step 2
(See Pre-Assembly)
Parts needed - No. 4 QTY 2
No. 10 QTY 2
Place the boards (
No’s. 4 & 11
)
on to the assembled base
frame along the longest
sides.
*Ensure the notches at either
end of each board are flush
and level with the ends of the
frame.
Fix each of the starter boards to
the frame by screwing through
the notch into the frame as
shown in the illustration.
4x70mm Screws
IMPORTANT:
Pre-drill before fixing screws.
Pre drill
hole
70mm
screw
Following the same
method arrange the remain-
ing framing (
No. 17
) inside the
assembled frame.
*Ensure there is an equal
amount of space between
each frame.
Secure each of the frames in
place using 2x70mm screws
for each side of the bearer,
ensuring the framing remains
level.
32x70mm Screws
b
a
b
a