P 10
Please retain product label and instructions for future reference
30mm
screw
HANDLE
WITH CARE
1
2
3
4
1.
2.
3.
4.
5.
30mm
screw
20
20
20
20
21
Felt
tacks
Step 15
Parts needed - No. 24
Cut the felt into five strips and
lay onto the roof in the order
shown in the illustration.
*Ensure there is approximately
50mm of overhanging felt each
side.
Once the felt is laid out fix to the
roof using felt tacks at 100mm
intervals.
*Felt size: 4132mm
252x Felt Tacks
Step 16
Parts needed - No. 20 QTY 2
No. 21 QTY 4
Align the fascia’s (
No. 20 & No.
21
) with the roof and fix into
place using 3x40mm screws
per fascia, making sure to
screw through the fascia into
the roof purlinsand eaves
frame.
*Ensure the angled cuts meet
at the top of the apex.
12x40mm Screws
Pre drill
hole
40mm
screw