Parts needed:
• (2) G6 - WALL RAIL - W101612
• (1) G4 - ARACHED WALL RAIL - W101634
• (2) M10 - WALL RAIL - W101648
• (1) M14 - WALL RAIL - W101646
Phase Notes
• Assemble with hardware as shown.
Hardware needed:
• (6) D - NUT BARREL WH 5/16x7/8 - H100005
• (6) AD - WASHER LOCK EXT12x19 - H100031
• (18) AC - WASHER LOCK EXT8x19 - H100030
• (4) K - BOLT WH 5/16x2 - H100012
• (2) H - BOLT WH 5/16x1-1/2 - H100010
• (12) AA - LAG SCREW WH 5/16x2-1/2 - H100028
Fort Assembly
Phase 14
Step 1: Attach 'G6' Wall Rails to 'E1' fort
uprights, 'E8' left handle post and 'E9' deck
post using hardware 'AA' & 'AC', as shown.
E8
K
AA
AC
AC
AC
AC
G6
AD
D
G4
AA
AC
M10
G6
AA
AC
M10
D
AD
H
AC
AC
M14
E9
E1
E1
Note: It is vital that the fort
be level before and after
each phase of assembly.
To prevent board splitting, you
must pre-drill each board with
a 1/8" drill bit, before attaching.
Step 2: Attach 'G4' Arched Wall Rail to'E8'
left handle post and 'E9' deck post using
hardware 'K', 'AC', 'AD' & 'D' as shown.
Step 4: Attach 'M10' Wall
Rails to'E1' fort uprights,
'E8' left handle post and 'E9'
deck post using hardware
'AA' and 'AC', as shown.
Step 3: Attach 'M14' Wall Rail to 'E9'
deck post using hardware 'H', 'AC',
'AD' & 'D' as shown.