Fort Assembly
Phase 11
Phase Notes
• Assemble with hardware as shown.
Hardware needed:
• (10) AC - WASHER LOCK EXT8x19 - H100030
• (2) L - BOLT WH 5/16x2-1/4 - H100013
• (2) BG - T-NUT 5/16 - H100074
• (8) AA - LAG SCREW WH 5/16x2-1/2 - H100028
• (4) CK - SCREW PFH 8x2 - H100011
• (4) BS - SCREW PFH 8x1-3/4 - H100089
Parts needed:
• (1) H2 - FLOOR SUPPORT BOARD - W101608
• (1) H3 - FLOOR JOIST - W101638
• (2) H9 - FLOOR SUPPORT BOARD - W101619
• (2) J1 - FLOOR SUPPORT - W101037
• (1) E8 - LEFT HANDLE POST - W101620
• (1) E9 - DECK POST - W101645
CK
H2
E9
E8
H9
H3
H2
E1
E1
H2
AC
L
AA
AC
AC
J1
BS
E8
H9
H3
AA
AC
AC
H9
H3
E1
H2
J1
Step 1: Attach 'H9' Floor
Support Boards to 'E1' fort
uprights using hardware 'AA'
& 'AC', as shown.
Step 2: Attach 'H3' Floor
Joists to 'H9' floor support
boards using hardware 'CK',
as shown.
Step 3: Attach 'H2' floor support board to 'E8' &
'E9' Deck Posts using hardware 'L', 'AC', & 'BG',
as shown.
BG
Step 4: Attach 'J1' Floor Support to 'E8' & 'E9'
Deck Posts using hardware 'BS', as shown.
Step 5: Attach 'H9' floor support boards to 'E8' &
'E9' Deck Posts using hardware 'AA' & 'AC', as
shown.
Note: It is vital that the fort
be level before and after
each phase of assembly.
To prevent board splitting, you
must pre-drill each board with
a 1/8" drill bit, before attaching.