6 Ft Rock Wall Green
Phase 1
Phase Notes
• Assemble slats to rails as shown.
• Note orientation of slats and arrange as shown.
• Attach rock wall board (M74) first. See detail at bottom.
• Using slats as a guide, pre-drill edges of rails
with a 1/8" drill bit. Failure to pre-drill may
result in board splitting.
SCREW PFH 8x1-1/2
LOCATE BOARD
FLUSH WITH
ANGLED EDGE
OF RAIL
TOP
TOP
M74
M75
M76
M74
M74
M75
M74
M76
M74
M75
M74
M76
M74
M75
M74
M76
M74
M75
M74
M76
M74
M74
N73
E85
E86
E86
M74
QTY DESCRIPTION LABEL
1 LEFT RAIL E85
1 RIGHT RAIL E86
1 ROCK WALL BOARD N73
12 ROCK WALL BOARD M74
5 ROCK WALL BOARD M75
5 ROCK WALL BOARD M76
92 SCREW PFH 8x1-1/2 PB