![Azbil AVP200 Скачать руководство пользователя страница 47](http://html1.mh-extra.com/html/azbil/avp200/avp200_user-manual_3042730047.webp)
2-9
Chapter 2: Installation
■
Connection position
The respective positions of the air supply connection and the output connection are
shown in the diagram below. The dimensions of the screws for the connections can be
selected based on the specifications.
Figure 2-7. Air Piping Connection
Note
When connecting a solenoid valve, air valve, or the like for emergency cutoff, install it
between the air output connection and actuator, and not on the supply air connection
side of the device.
Содержание AVP200
Страница 30: ......
Страница 66: ...2 28...
Страница 80: ...4 4 Menu Tree...
Страница 120: ...5 16...
Страница 128: ...6 8 For models those date of manufacture are before September 2017...
Страница 129: ...6 9 Chapter 6 Cautions regarding Explosion Proof Models For models those date of manufacture are before September 2017...
Страница 130: ...6 10 For models those date of manufacture are before September 2017...
Страница 131: ...6 11 Chapter 6 Cautions regarding Explosion Proof Models For models those date of manufacture are before September 2017...
Страница 132: ...6 12 For models those date of manufacture are before September 2017...
Страница 133: ...6 13 Chapter 6 Cautions regarding Explosion Proof Models For models those date of manufacture are after October 2017...
Страница 135: ...6 15 Chapter 6 Cautions regarding Explosion Proof Models For models those date of manufacture are after October 2017...
Страница 136: ...6 16 For models those date of manufacture are after October 2017...
Страница 138: ...6 18 For models those date of manufacture are after October 2017...
Страница 139: ...6 19 Chapter 6 Cautions regarding Explosion Proof Models For models those date of manufacture are after October 2017...
Страница 184: ...Appendix A Specifications A 25...
Страница 185: ......
Страница 188: ......
Страница 190: ......