9
CONNECTING SHAFT PIT
(Only for EN81-20 Standard)
Connect XK-KDM-SF1 and XK-KDM-PWR sockets
to the controller to implement shaft pit.
Connect SPT board, which is in shaft pit box
KDM, to the socket of the LOP in ground floor.
Connect other shaft pit devices to the terminals
of the KDM box as shown on the diagram in the
project schemas.
Place KRR switch at the landing onto door frame
or onto a wall near it. It must be located outside
of the shaft.
KRR switch must change its state after an exit
from pit inspection. Otherwise the system will not
switch to the normal mode.
CONNECTING SHAFT PIT
(Only for EN81-1 Standard)
Connect XK-KDM-SF1 socket to the controller to
implement shaft pit.