![Avidsen 114461 Скачать руководство пользователя страница 47](http://html1.mh-extra.com/html/avidsen/114461/114461_manual_3031446047.webp)
EN
47
F - MAINTENANCE AND UPKEEP
1 - MAINTENANCE WORK
Maintenance work must be carried out by the
installer or a qualified individual to guarantee the
installation’s operation and safety.
The number of maintenance and upkeep operations
must be proportional to the frequency the motorised
gate is used.
For use of about 10 cycles per day, it is necessary
to provide:
•
Maintenance of the mechanical parts every 12
months: tightening screws, lubrication, checking
the rail, guides and gate balance, etc.
•
Maintenance of the electronic parts every 6
months: motor operation, photocells, control
devices, etc.
2 - OPERATING INDICATORS
This system has two operating indicators: the battery
charge level (optional) and the history of events.
&KDUJHEDWWHULH
KLVWRULTXHGHVpYqQHPHQWV
FGGBDF
IJTUPSJRVF
/
/
/
/
/
&RGH
/
/
/
/
/
&RGH
/
/
/
/
/
&RGH
/
/
/
/
/
&RGH
/
/
/
/
/
²
²
²
0(18
6(7
T
352*
6(7
6(7
6(7
EFS
OJÒS
FFSS
FVS
delete
history
Battery charge
history of events
(last err
or)
3 - BATTERY VOLTAGE (FOR OPTIONAL
SOLAR POWER KIT)
You can display the battery charge level.
•
From
MENU 0
,
press
“SET”
, and the battery
charge level is then shown by the number of red
LEDs lit.
•
If the battery voltage level is too low (no LED on),
the gate will not close in order to avoid closing off
access.
CONNECTED MOTOR DRIVE KIT