Troubleshooting
Troubleshooting ISDN-PRI endpoints (wideband)
Maintenance Procedures
209
December 2003
Figure 59: Troubleshooting ISDN-PRI (Page 2 of 2)
Troubleshooting ISDN-PRI endpoints (wideband)
The following flow chart describes a layered approach for troubleshooting problems with an ISDN-PRI
endpoint. Because problems at lower layers affect upper layers, layers are investigated from low to high.
In this procedure, the:
•
DS1 facility is layer 1
•
TN2312AP IPSI circuit pack’s Packet Interface circuit is layer 2 (
S8100
: TN765 Processor
Interface is layer 2)
•
PRI endpoint’s ports are layer 3 (
S8100
: ISDN trunks are layer 3)
PAGE
YES
END
A
FROM
1
ARE
THERE
TRANSIENT
PROBLEMS MAKING
ISDN-PRI
ARE
THERE BIT
ERRORS OVER
HAS A
SYNCHRONIZATION
SOURCE BEEN
SYSTEM SWITCHING
IF PROBLEMS
STILL EXIST,
THEN ESCALATE
COMPARE INDICATED
FACILITY TO RECORD
OF PREVIOUS PROBLEMS
ARE BIT
ERRORS OCCURRING
MORE FREQUENTLY
THAN PREVIOUS
RECORD INDICATED
FACILITY AND, IF THIS
CONTINUES TO OCCUR,
CONTACT FACILITY OR
EXTERNAL EQUIPMENT
PROVIDER. THEN ESCALATE
THE TI FACILITY?
UNSTABLE?
AWAY FROM IT?
NO
YES
SEE UDS1-BD OR DS1-BD
MO FOR REPAIR PROCEDURES
IF SYNC PROBLEM IS DUE
TO SLIPS. OTHERWISE,
FOLLOW REPAIR
PERFORM AN IN-DEPTH
ANALYSIS OF T1
FACILITY INCLUDING:
TRANSMISSION FACILITY,
EXTERNAL EQUIPMENT
(DACS, CSUs, ETC.)
AND ANY OTHER
NOISE-PRODUCING
EQUIPMENT.
REFER TO AT&T PRACTICE
#855-351-101 ISSUE 8,
JANUARY 1987. THIS
DESCRIBES T1 CABLING TO
CSUs, ETC, IN DETAIL
YES
NO
NO
NO
YES
END
CALLS
SEE SYNC MO
HISTORY
PROCEDURES FOR
SYNC MO
USE LIST
MEASUREMENTS
COMMAND
Содержание CMC1
Страница 1: ...Maintenance Procedures 555 245 103 Issue 1 1 December 2003 ...
Страница 14: ...Contents 14 Maintenance Procedures December 2003 ...
Страница 158: ...Server initialization recovery and resets System resets 158 Maintenance Procedures December 2003 ...
Страница 416: ...Additional maintenance procedures IP Telephones 416 Maintenance Procedures December 2003 ...
Страница 426: ...Index X 426 Maintenance Procedures December 2003 ...