23
The final test is for the counters. The counters are increased by one increment. Note the counts
on both counters and press “OK”, Figure 4.2J. A visual check is made to see if both moved up
one count.
Record the initial reading of every counter before conducting counter testing.
Enter “Yes” or “No” depending on the counter function test Figure 4.2K. If the answer to the
counter function test is “No”, the voting program will be terminated and the system will shut
down, press “OK”, Figure 4.2L. This voting unit is not suitable for conducting an election until
the counter is repaired. When you press “Yes” the system will print out Figure 4.2M.
Figure 4.2J
Figure 4.2K
Figure 4.2L