Owner Installation Instructions
GDO-9v2 SecuraLift®
11
Knockdown C-Rail Assembly
Step 1 - Knockdown C-Rail Assembly
Unpack and assemble the C-Rail as shown above in
Fig 04.
04
fi g
Adjust chain tension: Move the shuttle to middle of track. Use a spring scale to
measure required force to pull the shuttle adjust 1/2” hex bolt to tension chain.
Recommended pull force: 8kg (80N)
Screws
10
Screws
Turn tracks around
9
Tension 1/2” hex bolt
8
Swing and straighten
6
Slide sleeve
7
5
Swing
Slide sleeve
3
4
Cut cable tie
2
Swing and straighten
Start
Swing
1