Id.Nr.: 229224-9 •
5
District heating tank FSN and FSN-E
The warming-up period and the maximum input power for district heating supplies can be taken from
the following diagrams:
Warming-up Period FSN and FSN-E*
Max. input power FSN and FSN-E*
*at a primary flow volume of 300l/h
Immediately after warming up, the heating circuit is closed so that no further losses are incurred as is
usually the case due to the formation of leakage currents when the system is only regulated through
back-flow temperature limitation.
Flow temperature in °C
Power in kW
W
arming-up period in minutes
Flow temperature in °C