17. Domestic Hot Water Side Connection (pressure resistant) 
 F

In cases in which unsuitable or non-functional storage tank connection fittings are used as well as 
in cases in which the stated operating pressure is exceeded, we shall refuse to guarantee the water 
heater in any way whatsoever.
All  water  heaters  that  display  a  nominal  pressure  of  6  bar  (ATO  or  kp/cm

2

) on their rating plates 

are pressure resistant storage tanks and can be connected pressure-tight at a mains pressure of 
up to 5.5 bar (ATO). 

If the system pressure is higher then a pressure reduction valve must be 

installed in the cold water input pipe.

The water connection must only take place via a certified membrane safety valve or a membrane safety 
valve combination - connection fitting for pressure resistant storage tanks.
A safety valve combination consists of shut-off, back-flow, drainage and safety valves with expand-
able water outlet and is installed between the storage tank's cold water inlet pipe (blue) and cold 
water inlet in an 

appropriate sequence

.

As a general rule the following is to be noted:

In order to ensure the faultless functioning of the connection fittings these may only be installed in 
frost-protected spaces.  The outlet of the safety valve must be open and observable and/or the outlet 
pipe from the drip tray (water overflow funnel) must not terminate outside so that neither frost nor 
blockages due to dirt and the like can result in a malfunction. Care must be taken to ensure that the 
drip container is not blocked.
Furthermore, care must be taken to ensure that the outlet pipe of the safety valve is installed with a 
constant incline.

No shut-off valve or any other restriction may be installed between the safety valve and the storage 
tank cold water inlet.
The safety valve must be configured for a trigger pressure that is lower than the nominal pressure (6 
bar) of the storage tank. Before the final connection of the storage tank the cold water inflow pipe 
must be flushed through.

Once the water has been connected and the storage tank has been filled without air bubbles, the 
function of the connection fittings must be checked.

a)  In order to avoid a blockage of the safety valve's venting mechanism as a result of lime-scale 

depositing, the safety valve's venting mechanism should be operated from time to time dur-
ing the operation of the system. It should be observed whether or not the valve re-closes after 
releasing the venting mechanism and whether or not the queued water is drained off completely 

Drainage Valve

Safety Valve

Back-flow Valve (Return-flow Inhibitor)

Test Valve

poss. Pressure Reduction Valve

Shut-off Valve

User Fittings

Содержание FSN

Страница 1: ...Operating and Installation Instructions District heating tank FSN and FSN E Please forward this on to the user Id Nr 229224 9...

Страница 2: ...reciate The environmentally friendly CFC free insulating foam ensures an extraordinarily low standby energy consumption For the sake of the environment Austria Email AG s ARA Junk Recy cling Austria A...

Страница 3: ...Dimensions Sketch F 11 13 Special Suspensions B F 12 14 Connection Requirements B F 13 15 District Heating System Connection B F 14 16 Accessories and Plastic Base Installation F 15 17 Domestic Hot Wa...

Страница 4: ...de of polyurethane foam CFC free boiler foam fitted directly into the outer casing Benefit low standby energy consumption Stove enamelled powder coated outer casing of steel plate white Precisely disp...

Страница 5: ...and FSN E Max input power FSN and FSN E at a primary flow volume of 300l h Immediately after warming up the heating circuit is closed so that no further losses are incurred as is usually the case due...

Страница 6: ...umption B F If a water heater is heated up and no water is released for a long time after the heating process an albeit gradual but continuous cooling of the stored water via the surface of the device...

Страница 7: ...ot play with the device 6 Temperature Setting FSN E B F As an aid to setting the temperature the temperature regulator knob has 4 main positions being Position Frost protection for the storage tank up...

Страница 8: ...by the district heating grid wintertime operation 8 Thermometer B F There is a remote thermometer built into the front panel of the device for monitoring the stored water temperature The display value...

Страница 9: ...st be carried out in a place where one might reasonably expect it to be i e the device must be easily accessible in case of servicing repairs or in case it needs to be replaced The hot water storage t...

Страница 10: ...iling mounting f Ifawaterheaterisfittedwithcovers cladding innarrowsmallspacesorinsuspendedceilingsandthelike itiscrucialtoensurethattheconnectionsideofthedevice waterconnections electricalconnectionr...

Страница 11: ...r 229224 9 11 District heating tank FSN and FSN E 12 Dimensions Sketch F Type Con tents Litre Dimensions in mm A B C FSN 110 115 1366 1036 550 800 FSN 140 145 1566 1236 750 1000 FSN 190 195 1900 1570...

Страница 12: ...12 Id Nr 229224 9 District heating tank FSN and FSN E 13 Special Suspension B F Thin wall suspension Ceiling suspension...

Страница 13: ...r Storage Tank 2 Heat Exchanger 3 Back flow Valve 4 Zone Valve 5 Safety Valve 6 Return Flow Inhibitor 7 Dirt Trap 8 Drainage Valve 9 Electric Heating 10 Bleeding Thermostat for electric heating Thermo...

Страница 14: ...ing up temperature via the remote heating circuit is done electrically and the setting is fixed in the factory An additionally installed temperature limiting device prevents overly high back flow temp...

Страница 15: ...Id Nr 229224 9 15 District heating tank FSN and FSN E 16 Accessories and Plastic Base Installation F...

Страница 16: ...spaces The outlet of the safety valve must be open and observable and or the outlet pipe from the drip tray water overflow funnel must not terminate outside so that neither frost nor blockages due to...

Страница 17: ...valve will have to be completely replaced Implementation Installation Company Interval annually To check the back flow valve the shut off valve is closed and no water should escape via the open test...

Страница 18: ...le must be inserted into the connection space of the storage tank and be prevented from being pulled out and twisted by a strain relief mechanism For register storage heaters a second cable insert is...

Страница 19: ...ather season if the device will be out of action for several days and is not being operating in frost protection mode see Point 6 The draining of the domestic water is carried out once the shut off va...

Страница 20: ...heating flange it is crucial to use a new seal The specially enamelled inner container of the water heater must not come into contact with boiler scale solvent do not use the de calcifying pump Remov...

Страница 21: ...ence connecting to incorrect voltage corrosion damage as a consequence of aggressive waters water not suitable for drinking in accordance with the national regulations e g Austrian ordinance on drinki...

Страница 22: ...t if all the regulations standards assembly and operating instructions general guidelines etc are observed the defect in the unit or product causal for occurrence of the secondary damage would not hav...

Страница 23: ......

Страница 24: ...erreich Burgenland A 1230 Wien Zetschegasse 17 Telefon 01 615 07 27 Fax 01 615 07 27 260 E Mail tvondal austria email at Steiermark K rnten Osttirol A 8054 Graz Dr Heschl Weg 6 Telefon 0316 271 869 Fa...

Отзывы: