6.2.1.
Terminal compartment (for mains connection): open
Figure 26: Terminal compartment: open
[1A]
S/SH cover (figure shows S version)
[1B]
Connection housing (SD version)
[2]
Screws
[3]
O-ring
[4]
Screws for socket carrier
[5]
Socket carrier
[6]
Cable entry
[7]
Blanking plug
[8]
Cable gland (not included in delivery)
Information
For S/SH version, connection of HART cables is made at the socket carrier. For SD
version, connection of HART cables is separate of mains connection (refer to <HART
terminal compartment: open>).
Electric shock due to presence of hazardous voltage!
Failure to observe this warning results in death or serious injury.
→
Disconnect device from the mains before opening.
→
Wait for 30 seconds after power cut-off prior to opening the housing.
1.
Loosen screws [2] and remove cover [1] or connection housing [1B].
2.
Loosen screws [4] and remove socket carrier [5] from cover [1A] or connection
housing [1B].
29
SAV 07.2 – SAV 16.2 / SARV 07.2 – SARV 16.2 Control unit: electronic (MWG)
ACV 01.2 HART
Electrical connection