10
8
Maintenance
The ALL-IN-SEALER is a relatively simple machine which needs very little maintenance. There are a few
repairs which could be carried out by yourself. For other repairs please contact your dealer or Audion
Elektro.
−
Always dissonnect the sealer from the main power supply in case of maintenance or repairs.
−
Wait till the machine has cooled down before any maintenance or repairs are carried out.
−
Before switching off the cooling ventilator and the motor the ALL-IN-SEALER must cool down or at
least 10 minutes!
−
Only use spare parts supplied by Audion Elektro.
The maintenance schedule below is for normal use. In case of intensive use or under extreme
circumstances maintenance should be executed more frequently.
Daily maintenance:
PTFE-belts
Check if the PTFE-belts are clean. If necessary, clean them
with a wet cloth.
Heating plates
Check if the plates are clean. If necessary, clean them with a
wet cloth.
Weekly maintenance:
Driving mechanism
Check condition of driving mechanism and rotating parts. If
needed, lubricate them.
V-belts
Check condition (rupture) and tension.
Conveyor belt
Check condition (rupture) and tension.
Cleaning
Clean the All-In-Sealer with a wet cloth and soft soap.
Содержание D 555 NH
Страница 1: ...AUDION ELEKTRO ALL IN SEALER D 555 NH MANUAL D555 NH ENG Rev06...
Страница 20: ...Appendix A1 14 Electrical circuit...
Страница 21: ...Appendix A2 Electrical circuit...
Страница 22: ...Appendix B1 15 Exploded views...
Страница 23: ...Appendix B2 Exploded views...
Страница 24: ...Appendix B3 Exploded views...
Страница 25: ...Appendix B4 Exploded views...
Страница 26: ...Appendix B5 Exploded views...