
7. Test Descriptions
Test Sequence :
1. Monitor is powered up in the quiescent state.
2. All RED channels are at AC line.
3. Redenable input is active.
4. Ra1 on and fYa1 is flahsing.
5. Delay 2000ms.
6. Check fault state (transfer) state of the MMU2
7. fYa1 off
8. Repeat for FYA channel pairs 2 – 4.
Monitor Response to PASS
:
MMU2 must be found in the fault state in step 6.
Ra/Ga Dual Indication
(All modes except G and H)
Test Description :
Verify that the appropriate channel pairs are functioning as one four input logical channel and recognize a dual
indication condition.
Test Sequence :
1. Monitor is powered up in the quiescent state.
2. All RED channels are at AC line.
3. Redenable input is active.
4. Ra1 on and Ga1 on.
5. Delay 1250ms.
6. Check fault state (transfer) state of the MMU2
7. Ga1 off
8. Repeat for FYA channel pairs 2 – 4.
Monitor Response to PASS
:
MMU2 must be found in the fault state in step 6.
Ya/fYa Dual Indication
(All modes except G and H)
Test Description :
Verify that the appropriate channel pairs are functioning as one four input logical channel and recognize a dual
indication condition.
Test Sequence :
1. Monitor is powered up in the quiescent state.
2. All RED channels are at AC line.
3. Redenable input is active.
4. Ra1 off
5. Ya1 on and fYa1 is flahsing.
6. Delay 3000ms.
7. Check fault state (transfer) state of the MMU2
8. Ya1 off and fYa1 off
9. Ra1 on
10. Repeat for FYA channel pairs 2 – 4.
Monitor Response to PASS
:
MMU2 must be found in the fault state in step 7.
Ra/Ga Dual Indication
(All modes except G and H)
Test Description :
Verify that the appropriate channel pairs are functioning as one four input logical channel and recognize a dual
indication condition.
PCMT-8000 User's Manual
Rev. 1.7
38 of 80