23
ATTENTION
Electrocution risk. Use insulating gloves and carpet foreseen for works done on hazardous
electrical components.
Label the cables of the GRID line and EPS line.
Sheathe the cables and pass them through a slot located on the back of the structure (Picture 16).
Picture 16 – Cable entries of the GRID and EPS line
Then connect them to the terminals respecting the indications of the electrical schemes:
Grid line Terminal box QG - M1:
PHASE R / L1: terminal R1.1
PHASE S / L2: terminal S1.1
PHASE T / L3: terminal S1.1
NEUTRAL: terminal N1.1
EARTH: terminal GND
EPS line Terminal box QG - M1:
PHASE R / L1: terminal R2.2
PHASE S / L2: terminal S2.2
PHASE T / L3: terminal S2.2
NEUTRAL: terminal N2.2
EARTH: terminal GND
CABLE ENTRIES
OF GRID AND
EPS LINE (IF
AVAILABLE)