![ATON RA.Store-3 Скачать руководство пользователя страница 15](http://html1.mh-extra.com/html/aton/ra-store-3/ra-store-3_installation-manual_3004692015.webp)
15
Picture 6 – Indication of the fixing points of the handles on the left side;
the same points are present on the right side
Picture 7 - Application handles to the structure on the left side;
replicate the assembly on the right side
3.3.2.4
Transport of the basic structure, batteries and plastic parts separated
Lift the structure and move it in the desired location.
ATTENTION
The handling of the structure must be executed by 4 people and each person holds a different
handle.
Move in the desired location the batteries and the plastic parts previously disassembled.
ATTENTION
Place the system
-
in a room that must be: dry, covered with a roof, not floodable, not potentially explosive,
without any rodents and inflammable materials nearby,
-
sheltered from the direct rays of the sun,
-
at a distance of 10 cm at least from the walls of the building in order to maintain a
correct ventilation,
-
on a surface capable to bear its weight.