28
4.
Put on ON all the protection and disconnection devices available on the GRID line (Picture 21).
5.
Put on ON all the protection and disconnection devices regarding the customer line (Picture 21).
Picture 21 - Activation (ON) of the protection and disconnection devices on the electrical installation
The display of the machine will turn on and just after some seconds the main screen will be shown (Picture 22).
Picture 22 – Main screen
ON
ON
ON