D 3.1 12
D_3
.1_0
1_G
B.
fm
1
2
-1
6
Central lubrication unit (
o
) (100)
The central lubrication unit turns on in
automatic mode when the drive engine
starts.
- Pumping time:
12 min
- Duration of the break: 2 h
m
It is prohibited to change the factory-set
durations of pumping and break without
consulting the technical customer serv-
ice!
A
Changing the duration of lubrication and
breaks may be necessary when placing
mineral or cement bound material mix.
Manual start of lubrication (pumping
time):
- Remove the cover lid (a).
- Keep the starting button (b) depressed for at least 2 sec.
- Replace the cover lid (a).
A
Observe the instructions of chapter „Maintenance“!
Track cleaner (
o
) (101)
Movable track cleaners (a) are fitted be-
fore the two front crawler tracks, which
divert the small obstacles to the side.
A
The track cleaners may be in folded
down position only while paving.
Tilting of the track cleaner:
- Remove the safety pin (b) and the bol-
ster.
- Set the track cleaner (a) to the re-
quired position and lock again with the
bolster and the safety pin.
Lincoln3.jpg/Lincoln9.jpg
a
b
Rockdeflec.eps
a
b
Содержание DYNAPAC Svedala Demag DF 115 C
Страница 2: ...VALUE QUALITY THE ORIGINAL Your Authorized Dynapac Dealer...
Страница 10: ......
Страница 18: ......
Страница 20: ......
Страница 44: ......
Страница 58: ......
Страница 62: ...D 1 4 4 D_1 4_01_GB fm 4 22 Element2_konv_Kette_635 bmp 9 12 9a 5 8 14 A 6 7 13...
Страница 64: ...D 1 4 6 D_1 4_01_GB fm 6 22 Element2_konv_Kette_635 bmp 9 12 9a 5 8 14 A 6 7 13...
Страница 66: ...D 1 4 8 D_1 4_01_GB fm 8 22 Element2_konv_Kette_635 bmp 27 19 18 17 28 29 B 16 25 26 22 21 20 23 24...
Страница 68: ...D 1 4 10 D_1 4_01_GB fm 10 22 Element2_konv_Kette_635 bmp 27 19 18 17 28 29 B 16 25 26 22 21 20 23 24...
Страница 70: ...D 1 4 12 D_1 4_01_GB fm 12 22 Element2_konv_Kette_635 bmp 27 19 18 17 28 29 B 16 25 26 22 21 20 23 24...
Страница 96: ......
Страница 120: ...D 4 6 24 D_4 6_01_GB fm 24 38 2 2 Error messages...
Страница 121: ...D 4 6 25 D_4 6_01_GB fm 25 38...
Страница 122: ...D 4 6 26 D_4 6_01_GB fm 26 38...
Страница 123: ...D 4 6 27 D_4 6_01_GB fm 27 38...
Страница 124: ...D 4 6 28 D_4 6_01_GB fm 28 38...
Страница 125: ...D 4 6 29 D_4 6_01_GB fm 29 38 2 3 FMI codes...
Страница 134: ......
Страница 146: ...E 01 12 E_01_GB fm 12 18 3 Auger extension auger type II Auger_DEM bmp...
Страница 147: ...E 01 13 E_01_GB fm 13 18 3 1 Mounting extension parts Sch_ver1 tif Sch_ver2 tif 16 5 9 10 8 7 6 14 15 12 11 12 5...
Страница 152: ......
Страница 154: ......
Страница 155: ...F_2 3_01_GB fm 1 2 F 2 3 1 F 2 3 Maintenance overview 1 Maintenance review 7 2 4 1 3 5 1 6 8 9 10...
Страница 157: ...F 3 0 1 F_3 0_01_GB fm 1 4 F 3 0 Maintenance Conveyor 1 Maintenance Conveyor...
Страница 161: ...F 4 1 1 F_4 1_01_GB fm 1 8 F 4 1 Maintenance Auger 1 Maintenance auger sub unit...
Страница 168: ......
Страница 180: ......
Страница 181: ...F 6 0 1 F_6 0_01_GB fm 1 8 F 6 0 Maintenance Hydraulic system 1 Maintenance hydraulic system...
Страница 189: ...F 7 2 1 F_7 2_01_GB fm 1 4 F 7 2 Maintenance Running gear 1 Maintenance running gear 635_ISO_Dyn bmp LW_DEM_inter bmp 43...
Страница 193: ...F 8 1 1 F_8 1_01_GB fm 1 20 F 8 1 Maintenance Electronic System 1 Maintenance Electronic System...
Страница 220: ......
Страница 221: ...F 10 0 1 F_10 0_01_GB fm 1 6 F 10 0 Checks decommissioning 1 Tests check up cleaning stopping...
Страница 226: ......