6
7
8
Print out the tie line translation and make sure that the
ports are configured as described in step 4.
> If the tie lines are translated correctly, go
on to
step 7.
> If the tie lines are not translated correctly
according to Form lb, repeat steps 4 through 6. If
the tie lines still aren’translated correctly, call the
National Service Assistance Center (NSAC)
at
l-800-628-2888 for help.
Remove the bridging clips and connect the tie line
ports to the network interface (a 66-type connecting
block).
From the 66-type block, cross-connect he line port 1 to
one of the ports you want to test (ports 2,3, or 4). See
Figure 4-3.
.
NOTE: Test only one port at a time.
4-24 Tie Line Troubleshooting
Содержание administration and
Страница 1: ...AT T 518 600 016 MERLIN II COMMUNICATIONS SYSTEM Installation Administration and Maintenance Manual ...
Страница 40: ...FIGURE 1 9 System architecture Theory of Operation 1 37 ...
Страница 175: ...Top cover Front cover FIGURE 2 27 Control unit covers Testing the System 2 107 ...
Страница 177: ...Top cover E m p t y m o d u l e FIGURE 2 28 Installing the control unit top cover Testing the System 2 109 ...
Страница 179: ...Front cover E m p t y module FIGURE 2 29 Installing the control unit front cover Testing the System 2 111 ...
Страница 211: ...FIGURE 3 I A MERLIN II System Display Console The Administrator Attendant Console 3 3 ...
Страница 213: ... FIGURE 3 2 A BIS 34D Console The Administrator Attendant Console 3 5 ...
Страница 217: ...1 1 FIGURE 3 3 Administration Menu for MERLIN II System Release 3 The Administrator Attendant Console 3 9 ...
Страница 218: ...t FIGURE 3 4 Administration Menu for MERIJN II System with Feature Module 2 3 10 The Administrator Attendant Console ...
Страница 331: ...General Tests 4 55 Reaming the Control Unit 4 55 Testing Outside Lines 4 56 ...
Страница 389: ...Section 5 Ordering Information Ordering Information 5 1 Product Listing 5 1 Ordering Information 5 1 ...